Pipeline process
Pipeline for QA is a project board for developers and testers used to track the status of a pull request, get reviews and manual testing, and run autotests.
The generally accepted requirements for its use are described below:
Opening a PR
- Once a PR is created, it moves to the
REVIEW
column where a review will be requested automatically. - You can also request a review inside the PR from a particular person if needed.
- When creating a PR, do not forget to assign it to yourself.
- Also in case the PR adds new functionality, a short description would be appreciated.
What if the work is still in progress?
- If PR work is not finished yet, please mark it as a draft or add [WIP] to the title and keep it in the
CONTRIBUTOR
column until it's ready to be reviewed/tested. - Alternatively, you can open a
draft
.
When is a PR considered ready to move forward?
Ready for testing, a PR should meet the following criteria:
- Reviewed and has at least 1 approval.
- Rebased to the
develop
branch (bothstatus-mobile
andstatus-go
if needed, depending on what part has changes).- NOTE: QAs can use the
Update with rebase
button from GitHub if:- The PR has no
status-go
changes. - The PR has no conflict with the develop branch.
- The PR has no
- NOTE: QAs can use the
- All possible conflicts have been resolved.
- Has the label:
request-manual-qa
orskip-manual-qa
. - PRs MUST identify what area is affected and should have a description.
NOTE: Make sure that QAs are OK with that
Adding skip-manual-qa
- Please ask another team member before adding the
skip-manual-qa
label (PR/Status community/DMs) so that there's a second opinion. - The PR MUST have a proper reasoning why manual QA is skipped.
- The PR MUST include the steps of testing that has been done by the developer prior to moving it forward. From the perspective of a developer it means that once work on PR is finished:
-
It should be rebased to the latest
develop
. If there are conflicts - they should be resolved if possible. -
If the PR was in the
Contributor
column - it should be moved toReview
column. -
Wait for the review.
-
Make sure that after review and before requesting manual QA your PR is rebased to current develop.
-
The PR MUST be moved to the E2E column when it is ready for testing (mandatory for all PRs). That will also trigger e2e tests run. QAs are monitoring PRs from E2E column and take it into test.
-
After that - PR will be taken into manual testing by the QA team.
E2E tests and analyzing the results
This step cannot be skipped. So, at least one comment from the status-im-auto
bot with results is a prerequisite for moving forward.
Information on how to analyze tests can be found here.
Tests might be flaky, as they depend on infrastructure - SauceLabs and Waku.
If there are Failed tests
and you are not sure about the reason, you can always ping the mobile QAs for help (preferably in PRs by @status-im/mobile-qa
).
For now, it is the only reliable source of regression in the app because, due to time constraints, it is not possible to test thoroughly each PR. Please, respect this rule.
Testing PR
Manual testing
Prerequisites for manual testing
- PR has a description of the change and details the area of the application affected by the change.
- PR has automation results from the previous E2E test run step.
- PR includes a demo, test steps, and any possible regression(s)
- If appropriate, PR details what elements of a feature are out of scope.
If one of the prerequisites is missing, the PR will be moved to the contributor folder with a corresponding comment.
- If you think a PR needs and is ready for manual testing, please add the
request-manual-qa
label. - QA engineer picks up one of PRs with the
request-manual-qa
label, drags the item to theIN TESTING
column and assigns it to themselves. - During testing, QA will add comments describing the issues found, and also review automation tests results.
Usually found issues are numbered as "Issue 1, Issue 2", etc.
When the first round of testing is completed and all issues for this stage are found, the QA can add the
Tested - Issues
label and drag the card to theCONTRIBUTOR
column. These two actions are optional.
IMPORTANT NOTE: when the issues are fixed, developer MUST notify the QA that it is ready to be re-tested again by mention them in the PR.
- When manual testing of the PR is fully completed and all the issues are fixed, the QA adds the
Tested - OK
label and drags the card to theDesign review
column (the cases when design review is necessary are described below). - If design review is not required, the QA drags the PR to the
MERGE
column. After that the developer merges PR into develop. - If design review has been done, the designer (
@Francesca-G
) drags the PR to theMERGE
column. After that the developer merges PR into develop. - If manual testing/design review was not carried out, the developer drags PR to the
MERGE
column themselves.
Design review
How do I know if a design review is needed?
There are three cases here depending on the changes in the PR:
- Functional PRs with UI changes: after the
Tested - OK
label is added, the QA moves the PR to theDesign review
column + mentions@Francesca-G
in comments. - Component PRs: once the PR has received a review from developers and e2e tests results, it can be moved directly to the
Design review
column by the developer (manual testing step can be skipped) + the developer mentions@Francesca-G
in comments. - Functional PRs changes in which are not related to UI (e.g. a crash fix): skip the
Design review
step (the PR should only be manually tested by QA).
There are three possible scenarios when the design review is completed:
- Approved by design > the PR is moved to the
MERGE
column by Francesca - Some changes requested, but can be fixed as followups > need to be negotiated with Francesca > Francesca moves PR to the
MERGE
column and adds theFollow-up required
label > follow-ups should be added by the dev right after the PR is merged - Some changes requested, they should be fixed before merge > Francesca reviews the PR again after the fixes and moves PR to the
MERGE
column fromDesign review
Notes:
- If your PR has a long story and started from
develop
branch several days ago, please rebase it to current develop before adding label - if PR can be tested by developer (in case of small changes) and/or developer is sure that the changes made cannot introduce a regression, then PR can be merged without manual testing. Also, currently, PRs are not manually tested if the changes relate only the design (creation of components, etc.) and do not affect the functionality.
Why my PR is in Contributor
column?
PR can be moved to this column by the status-github-bot
or by QA engineer with label Tested-issues
or if one of the requirements for manual QA was not met.
In the first case most often this happens due to conflicting files in PR.
In the second case - after fixing of all found issues, the developer should ping the QA in the PR comments for retesting.
Merging a PR
Merge conditions:
-
Required number of reviews received
-
E2E results are received and reviewed
-
All commits are squashed into one.
-
No conflicting files in PR
-
No issues from lint
-
Pay attention to automation checks (some of them are not blockers, best to check before merge anyway)
-
In case of manual testing - the label
Tested - OK
from QA -
In case of design review - the approval from the designer
You can merge your PR into develop - some useful clues you can find here
HAPPY DEVELOPMENT! 🎉