# Cross-Team Epic Delivery Workflow
This guide documents the optimal steps to create and work on Feature Epics in a collaborative way.
## Table of Contents
- [Cross-Team Epic Delivery Workflow](#cross-team-epic-delivery-workflow)
- [Table of Contents](#table-of-contents)
- [1. Epic Creation (Product / Dev / Design)](#1-epic-creation-product--dev--design)
- [2. Design Exploration Phase](#2-design-exploration-phase)
- [3. Final Design Approval \& Handoff](#3-final-design-approval--handoff)
- [4. Development Planning](#4-development-planning)
- [5. Design QA (Post-Implementation Review)](#5-design-qa-post-implementation-review)
- [6. Epic Completion](#6-epic-completion)
- [TLDR Summary Workflow (High-Level)](#tldr-summary-workflow-high-level)
## 1. Epic Creation (Product / Dev / Design)
* An **EPIC** is created for any new feature or major improvement (by product, dev or design teams).
* The EPIC includes:
* Feature requirements
* High-level scope
* Known constraints or assumptions
* The epic is assigned to the **Design Team** with the label **<code>needs-design</code>**.
## 2. Design Exploration Phase
* The designer changes the Epic status to **“In Progress”** once exploration begins.
* The designer starts drafting early concepts / prototypes.
* The designer is responsible for **pinging the Dev owner** early to initiate collaboration.
* Multiple review iterations may happen with:
* Dev / Product / QA engineers
* Syncs may be:
* **Async** (chat / comments) / **Sync calls**, as needed
* Communication should be **frequent**, potentially more than once per week for complex features.
## 3. Final Design Approval & Handoff
* Last meeting to present the final design
* Once iterated and aligned, the final design direction is agreed by:
* Design / Product / Dev
* The designer prepares and delivers the **Figma handoff package**.
* Includes adding a link to the Figma files to the Epic's description.
* The designer **removes the <code>needs-design</code> label** from the epic.
* The designer **pings the Dev team** (in the same epic) to indicate the feature is ready for implementation.
## 4. Development Planning
* The Dev owner reviews the final design.
* The Dev owner breaks down the epic into **small, actionable subtasks**.
* Subtasks include:
* UI components / Interactions / Edge states
* Integration work
* Non-visual logic affected by UI
* Automation test to be implemented by a QA engineer
* Design QA task
* The Dev owner assigns subtasks within the team (if needed) and starts implementation.
* It should have acceptance criteria
## 5. Design QA (Post-Implementation Review)
* Once the implementation is complete, **Dev notifies Design** and put the Status as `QA`.
* Designer reviews the built feature to ensure:
* Visual fidelity
* Correct interactions
* Proper responsive handling
* Consistency with the agreed design
* Designer to document all found issues in the Pull Request.
* Any necessary follow-ups are captured as subtasks and addressed by Dev.
## 6. Epic Completion
* When:
* All dev subtasks are done
* Design QA is approved
* Product is aligned
* The epic is marked as **Completed** and closed.
## TLDR Summary Workflow (High-Level)
1. <strong>Epic created -> assigned to Design with <code>needs-design</code></strong>
2. <strong>Design exploration -> prototypes -> early dev syncs</strong>
3. <strong>Final design agreed -> Figma delivered -> <code>needs-design</code> label removed -> dev notified</strong>
4. <strong>Dev decomposes work -> implements subtasks</strong>
5. <strong>Design QA -> fixes -> approval</strong>