Cross-Team Epic Delivery Workflow
This guide documents the optimal steps to create and work on Feature Epics in a collaborative way.
Table of Contents
1. Epic Creation (Product / Dev / Design)
- An EPIC is created for any new feature or major improvement (by product, dev or design teams).
- The EPIC includes:
- Feature requirements
- High-level scope
- Known constraints or assumptions
- The epic is assigned to the Design Team with the label
needs-design.
2. Design Exploration Phase
- The designer changes the Epic status to “In Progress” once exploration begins.
- The designer starts drafting early concepts / prototypes.
- The designer is responsible for pinging the Dev owner early to initiate collaboration.
- Multiple review iterations may happen with:
- Dev / Product / QA engineers
- Syncs may be:
- Async (chat / comments) / Sync calls, as needed
- Communication should be frequent, potentially more than once per week for complex features.
3. Final Design Approval & Handoff
- Last meeting to present the final design
- Once iterated and aligned, the final design direction is agreed by:
- Design / Product / Dev
- The designer prepares and delivers the Figma handoff package.
- Includes adding a link to the Figma files to the Epic's description.
- The designer removes the
needs-designlabel from the epic. - The designer pings the Dev team (in the same epic) to indicate the feature is ready for implementation.
4. Development Planning
- The Dev owner reviews the final design.
- The Dev owner breaks down the epic into small, actionable subtasks.
- Subtasks include:
- UI components / Interactions / Edge states
- Integration work
- Non-visual logic affected by UI
- Automation test to be implemented by a QA engineer
- Design QA task
- The Dev owner assigns subtasks within the team (if needed) and starts implementation.
- It should have acceptance criteria
5. Design QA (Post-Implementation Review)
- Once the implementation is complete, Dev notifies Design and put the Status as
QA. - Designer reviews the built feature to ensure:
- Visual fidelity
- Correct interactions
- Proper responsive handling
- Consistency with the agreed design
- Designer to document all found issues in the Pull Request.
- Any necessary follow-ups are captured as subtasks and addressed by Dev.
6. Epic Completion
-
When:
- All dev subtasks are done
- Design QA is approved
- Product is aligned
-
The epic is marked as Completed and closed.
TLDR Summary Workflow (High-Level)
- Epic created -> assigned to Design with
needs-design - Design exploration -> prototypes -> early dev syncs
- Final design agreed -> Figma delivered ->
needs-designlabel removed -> dev notified - Dev decomposes work -> implements subtasks