In Nim 2.0, the `test_fixture_operations` files fail to compile with:
```
Error: 'result' is of type <Result[system.void, system.cstring]> which cannot be captured as it would violate memory safety, declared here: /nimbus-eth2/tests/consensus_spec/bellatrix/test_fixture_operations.nim(130, 5); using '-d:nimNoLentIterators' helps in some cases. Consider using a <ref Result[system.void, system.cstring]> which can be captured.
```
Wrapping the `applyExecutionPayload` in a factory that takes `path`
avoids this problem.
Suite names were not being used because `test` has to have access to it
during instantiation - this PR cleans things up a little while at the
same time upgrading unittest2.
* async batch verification
When batch verification is done, the main thread is blocked reducing
concurrency.
With this PR, the new thread signalling primitive in chronos is used to
offload the full batch verification process to a separate thread
allowing the main threads to continue async operations while the other
threads verify signatures.
Similar to previous behavior, the number of ongoing batch verifications
is capped to prevent runaway resource usage.
In addition to the asynchronous processing, 3 addition changes help
drive throughput:
* A loop is used for batch accumulation: this prevents a stampede of
small batches in eager mode where both the eager and the scheduled batch
runner would pick batches off the queue, prematurely picking "fresh"
batches off the queue
* An additional small wait is introduced for small batches - this helps
create slightly larger batches which make better used of the increased
concurrency
* Up to 2 batches are scheduled to the threadpool during high pressure,
reducing startup latency for the threads
Together, these changes increase attestation verification throughput
under load up to 30%.
* fixup
* Update submodules
* fix blst build issues (and a PIC warning)
* bump
---------
Co-authored-by: Zahary Karadjov <zahary@gmail.com>
This PR removes a few hundred thousand temporary seq allocations during
state transition - in particular, the flag seq was allocated per
validator while committees are computed per attestation.
We have several modules that import `nim-eth` for the sole purpose of
its `keys.newRng` function. This function is meanwhile a simple wrapper
around `nim-bearssl`'s `HmacDrbgContext.new()`, so the import doesn't
really serve a use anymore. Replace `keys.newRng` with the direct call
to reduce `nim-eth` imports.
* require sync committee supermajority in CI
To better catch problems with sync committee messages in CI, extend
local testnet simulation to also verify that each block is signed
by a supermajority of the sync committee.
Requires #5083 and #5084
* lint
The consensus-spec-tests already cover the scenarios of our custom test
runner, so the custom tests can be removed. Also cleans up unused config
flags and related unreachable logic.
Just the variable, not yet `lcDataForkAtStateFork` / `atStateFork`.
- Shorten comment in `light_client.nim` to keep line width
- Do not rename `stateFork` mention in `runProposalForkchoiceUpdated`.
- Do not rename `stateFork` in `getStateField(dag.headState, fork)`
Rest is just a mechanical mass replace
Other changes:
Renamed the `EIP_4844_FORK_*` config constants to `DENEB_FORK_*` as
this matches the latest spec and it's already used in the official
Sepolia config.