* Add @description decorator
* Unify test case naming style
* more clean ups
* Altair tests cleanup
* Clean up Altair and Bellatrix `process_deposit` tests
* Clean up Bellatrix tests
* Clean up Capella tests
* PR feedback from @ralexstokes
* Add comments on the deposit fork version tests
* Remove `test_incorrect_sig_other_version` since it is duplicate to `test_ineffective_deposit_with_bad_fork_version`
* Add `test_ineffective_deposit_with_current_fork_version`
While the light client sync protocol currently provides access to the
latest `BeaconBlockHeader`, obtaining the matching execution data needs
workarounds such as downloading the full block.
Having ready access to the EL state root simplifies use cases that need
a way to cross-check `eth_getProof` responses against LC data.
Access to `block_hash` unlocks scenarios where a CL light client drives
an EL without `engine_newPayload`. As of Altair, only the CL beacon
block root is available, but the EL block hash is needed for engine API.
Other fields in the `ExecutionPayloadHeader` such as `logs_bloom` may
allow light client applications to monitor blocks for local interest,
e.g. for transfers affecting a certain wallet. This enables to download
only the few relevant blocks instead of every single one.
A new `LightClientStore` is proposed into the Capella spec that may be
used to sync LC data that includes execution data. Existing pre-Capella
LC data will remain as is, but can be locally upgraded before feeding it
into the new `LightClientStore` so that light clients do not need to run
a potentially expensive fork transition at a specific time. This enables
the `LightClientStore` to be upgraded at a use case dependent timing at
any time before Capella hits. Smart contract and embedded deployments
benefit from reduced code size and do not need synchronization with the
beacon chain clock to perform the Capella fork.
Adds `create_light_client_bootstrap` and `create_light_client_update`
functions as a reference implementation for serving light client data.
This also enables a new test harness to verify that light client data
gets applied to a `LightClientStore` as expected.
`LightClientUpdate` structures currently use different merkle proof root
depending on the presence of `finalized_header`. By always rooting it in
the same state (the `attested_header.state_root`), logic gets simpler.
Caveats:
- In periods of extended non-finality, `update.finalized_header` may now
be outdated by several sync committee periods. The old implementation
rejected such updates as the `next_sync_committee` in them was stale,
but the new implementation can properly handle this case.
- The `next_sync_committee` can no longer be considered finalized based
on `is_finality_update`. Instead, waiting until `finalized_header` is
in the `attested_header`'s sync committee period is now necessary.
- Because `update.finalized_header > store.finalized_header` no longer
holds (for updates with finality), an `is_better_update` helper is
added to improve `best_valid_update` tracking (in the past, finalized
updates with supermajority participation would always directly apply)
This PR builds on prior work from:
- @hwwhww at https://github.com/ethereum/consensus-specs/pull/2829
Some tests are currently restricted to a single phase using @with_phases
even though they could likely run unchanged in later phases. This patch
changes the default for such tests to also run in later phases. If the
beacon chain changes enough in later phases to break these tests, this
highlights that the tests need to be adjusted or extended accordingly.