mirror of
https://github.com/status-im/docs.status.network.git
synced 2026-08-27 08:31:07 +00:00
Update documentation for Hoodi Testnet shutdown and Linea merger
- Revised warning messages across multiple documentation files to reflect the upcoming shutdown of the Hoodi testnet on May 15, 2026, and the merger of Status Network into the Linea stack. - Added information regarding the migration of testnet ETH and the status of pre-deposit vaults, ensuring users are informed about necessary actions and timelines. Signed-off-by: yjkellyjoo <yejinkellyjoo@gmail.com>
This commit is contained in:
committed by
Yejin Kelly Joo
parent
facdb2524a
commit
d294fa5847
@@ -10,8 +10,8 @@ import CopyCell from '@site/src/components/CopyCell';
|
||||
|
||||
# Network Details
|
||||
|
||||
:::warning Sepolia Testnet Sunset
|
||||
The Sepolia-based testnet is subject to be sunsetted by the end of April 2026. Please migrate to the new **Status Network Hoodi Testnet** below. Refer to the [migration guide](https://status-im.notion.site/status-network-sepolia-testnet-deprecation-notice) for more information.
|
||||
:::warning Hoodi Testnet Shutdown — May 15, 2026
|
||||
Status Network is merging into the Linea stack. The Hoodi testnet (chain ID 374) — RPC, bridge, and all infrastructure — will be shut down on **May 15, 2026**. If you have testnet ETH on the L2, bridge it back to L1 via [bridge.status.network](https://bridge.status.network) before that date. Balances remaining after shutdown will be unrecoverable. [Read the full announcement](https://status.network/blog/status-network-merges-with-linea-scaling-gasless-privacy-upstream).
|
||||
:::
|
||||
|
||||
## Status Network Hoodi Testnet
|
||||
|
||||
@@ -6,6 +6,10 @@ keywords: [Status Network, pre-deposits, vaults, Aragon, Generic Protocol, Karma
|
||||
|
||||
# Pre-Deposits
|
||||
|
||||
:::info Status Network × Linea Merger — What this means for vault holders
|
||||
Following the [merger of Status Network into Linea](https://status.network/blog/status-network-merges-with-linea-scaling-gasless-privacy-upstream), pre-deposit vaults remain fully backed and safe. No action is needed now. When the withdrawal interface opens, you will be able to claim your deposits + accrued yield + liquid SNT/LINEA rewards (from the 20M SNT + 20M LINEA pool) on **Linea Mainnet**. An announcement will be made when withdrawals open.
|
||||
:::
|
||||
|
||||
Status Network runs a pre-deposit campaign to bootstrap liquidity and early Karma distribution ahead of mainnet. Two distinct vault systems power the campaign:
|
||||
|
||||
| Asset(s) | Vault provider | Receipt token | Network |
|
||||
|
||||
@@ -10,8 +10,8 @@ slug: /tools/core-infrastructure/bridge
|
||||
The Status Network bridge allows users to transfer tokens and pass messages between Layer 1 and Status Network (Layer 2).
|
||||
The bridge interface is available at [bridge.status.network](https://bridge.status.network).
|
||||
|
||||
:::warning Sepolia Testnet Sunset
|
||||
The Sepolia-based testnet is subject to be sunsetted by the end of April 2026. Please migrate to the new **Status Network Hoodi Testnet** below. Refer to the [migration guide](https://status-im.notion.site/status-network-sepolia-testnet-deprecation-notice) for more information.
|
||||
:::warning Hoodi Testnet Shutdown — May 15, 2026
|
||||
Status Network is merging into the Linea stack. The Hoodi testnet bridge will be shut down on **May 15, 2026**. Bridge your L2 testnet ETH back to L1 before that date — balances remaining after shutdown will be unrecoverable. [Read the full announcement](https://status.network/blog/status-network-merges-with-linea-scaling-gasless-privacy-upstream).
|
||||
:::
|
||||
|
||||
## Bridge Contracts
|
||||
|
||||
@@ -9,8 +9,8 @@ slug: /tools/core-infrastructure/testnet-faucets
|
||||
|
||||
To get started on Status Network testnet, you may need some testnet ETH or test assets.
|
||||
|
||||
:::warning Sepolia Testnet Sunset
|
||||
The Sepolia-based testnet is subject to be sunsetted by the end of April 2026. Please migrate to the new **Status Network Hoodi Testnet** below. Refer to the [migration guide](https://status-im.notion.site/status-network-sepolia-testnet-deprecation-notice) for more information.
|
||||
:::warning Hoodi Testnet Shutdown — May 15, 2026
|
||||
Status Network is merging into the Linea stack. The Hoodi testnet — including faucets, RPC, and bridge — shuts down on **May 15, 2026**. Bridge any testnet ETH back to L1 via [bridge.status.network](https://bridge.status.network) before that date. [Read the full announcement](https://status.network/blog/status-network-merges-with-linea-scaling-gasless-privacy-upstream).
|
||||
:::
|
||||
|
||||
## Status Network Testnet ETH Faucet
|
||||
@@ -61,8 +61,8 @@ Status Test Token (STT) is the testnet equivalent of SNT. It is used as a test a
|
||||
|
||||
## Status Network Sepolia Testnet Faucets — Deprecated {#sepolia}
|
||||
|
||||
:::warning Sepolia Testnet Sunset
|
||||
The Sepolia-based testnet is subject to be sunsetted by the end of April 2026. Please migrate to the new **Status Network Hoodi Testnet** below. Refer to the [migration guide](https://status-im.notion.site/status-network-sepolia-testnet-deprecation-notice) for more information.
|
||||
:::warning Hoodi Testnet Shutdown — May 15, 2026
|
||||
Status Network is merging into the Linea stack. The Hoodi testnet — including faucets, RPC, and bridge — shuts down on **May 15, 2026**. Bridge any testnet ETH back to L1 via [bridge.status.network](https://bridge.status.network) before that date. [Read the full announcement](https://status.network/blog/status-network-merges-with-linea-scaling-gasless-privacy-upstream).
|
||||
:::
|
||||
|
||||
## Support
|
||||
|
||||
Reference in New Issue
Block a user