mirror of https://github.com/logos-co/roadmap.git
1.8 KiB
1.8 KiB
title | description |
---|---|
SNT Optimism Bridge | Finalizig work necessary to bridge SNT to Optimism |
vac:sc::status:snt-optimism-bridge
%%{
init: {
'theme': 'base',
'themeVariables': {
'primaryColor': '#BB2528',
'primaryTextColor': '#fff',
'primaryBorderColor': '#7C0000',
'lineColor': '#F8B229',
'secondaryColor': '#006100',
'tertiaryColor': '#fff'
}
}
}%%
gantt
tickInterval 1month
dateFormat YYYY-MM-DD
section Status
SNT Optimism Bridge: 2023-09-01, 2023-09-30
- status: 100%
- CC: Ricardo
Description
This milestone comprises issues that have to be completed to bridge SNT to Optimism. These issues are part of enhancing the MimiMe token.
- https://github.com/vacp2p/minime/issues/19
- https://github.com/vacp2p/minime/issues/17
- https://github.com/vacp2p/minime/issues/7
- https://github.com/vacp2p/minime/issues/5
- https://github.com/vacp2p/minime/issues/31
Following enhancments to the MimiMe token (future work) are tracked in: vac/sc/g/status/mimime-token-enhancement
This milestone also contains:
- a listing of issues identified in the 1st Certora audit, which we addressed
- a listing of issues that are now out of scope because we forked the MimiMe repo, and removed parts we do not need
- Certora checking
Info
This milestone comprises what the SC has to deliver towards the completion of Status No1 prio:
the SNT contract for deployment on Optimism is top priority
Note: This milestone includes deployment on Goerli and "manual" testing. Integration tests for this milestone is out of scope for this milestone. If integration tests are desired, we would track and address this in a future milestone.