roadmap/content/codex/updates/2023-11-10.md

2.5 KiB

title tags date lastmod draft description
2023-11-10 Codex weekly
codex-updates
2023-11-14 2023-11-14 false Weekly update of Codex

Codex Update Nov 6th - Nov 10th

The team is working towards deploying a beta testnet by the end of the year, and most work is centered around finishing all the required functionality for that.

Client

Epic: Block Merkelization

Epic: Wiring the Proving System

Epic: Improve Client Stability

Marketplace

Epic: End-to-end Testing

  • Addressed access issues within the marketplacesuite template, pinpointing a problem with a provider declared in ethertest and overcoming the challenge through deep template layer analysis.
  • Discussions about improving the repostore maintenance module, specifically the method for returning bytes to Availabilities.
  • Optimizing multinode integration tests, streamlining the process to enhance efficiency and performance.
  • Integration test for the proving loop in the sales state module that was previously causing hang-ups, ensuring smoother operation.
  • Progressed towards a cleaner integration test structure with the creation of a draft PR, setting the stage for more structured testing and deployment.

Infra

  • Configure TCP/UDP port forwarding for Testnet deployment 80
  • Organize Grafana Dashboards 82
  • Configure Continuous Tests automation 69
  • Run Continuous Tests and check metrics
  • Organize Grafana Dashboards
  • Configure Continuous Tests automation enhancement
  • Update Vector config
  • Configure TCP/UDP port forwarding for Testnet deployment