roadmap/content/vac/updates/2023-10-30.md

7.0 KiB

title tags date lastmod draft
2023-10-30 Vac weekly
vac-updates
2023-10-30 2023-10-30 false

vac:p2p:

vac:tke:

  • vac:tke::codex:economic-analysis
    • Finish the Codex growth model and updated litepaper (@Matty)
  • vac:tke::status:SNT-staking
    • Following up with recent code changes SC has made (@Martin)
    • Coordinating setup of Snapshot space w/ Corey who is the owner (@Martin)
  • vac:tke::nomos:economic-analysis
    • Researching rewards for validators and delegators, evaluating new private PoS (0 or 1 stake weight design) w/ Marcin (@Frederico)
  • vac:tke::waku:economic-analysis
    • Martin participating in Waku calls, follows ups on "ENS" type approach to Waku stake (@Martin)

vac:dst:

  • wakurtosis:vac:rlog
  • analysis-shadow:waku:shadow-waku-relay-analysis
    • Worked in basic simulation with 10K Waku nodes (Pub/Sub Node)
  • analysis:nomos:simulation-analysis
    • The analysis is stable/automated, the machine runs are stable/automated, but the simulation bug(s) still effect results. (The nomos team is working on it)
    • simulation runs cont'
  • eng-10ktool:vac:bandwidth-test:
    • Push as many gossipsub nodes as deliver and deliver metrics, either by
      • Multiple gossipsub nodes per POD
      • Pushing further number of PODs per node
    • Clean up how to run it in a single bash script
  • admin/misc
    • Run simulations for zkvm team
  • software-testing:waku:test-plans
    • Added Interop tests section to all existing test plans. Ex: for filter
  • software-testing:waku:test-automation-js-waku
    • Addressed and merged all open PRs
    • Fixed CI logs
    • Helped reproduce, investigate and retest store cursor regression
  • vac:dst:software-testing:waku:test-automation-interop-testing
    • Started building the framework for nwaku <-> gowaku interop testing
  • software-testing:waku:test-automation-nwaku
    • Store tests
  • software-testing:waku:test-automation-go-waku

vac:acz:

vac:sc::

vac:nescience:

  • state-separation:vac:state-separation-doc
    • Researched techniques for harmonizing UTXO and based-account model for state separation. (Goal 1)
  • proofsystems:vac:research-existing-proof-systems
    • Researched techniques for proof creation and verification for Nova. (Goal 3)
    • Readings on zkVM and how to build from scratch
    • Updated Zotero with some papers and blog posts
    • Preparing for Zk hack
    • look into KiloNova
    • drafting document comparing theoretical complexities of proof schemes we've examined (part of Nescience's Goal 3).
  • proofsystems:vac:benchmarks
    • Updated Nova Cricuit document
    • Merged the Nova-Scotia PR
    • Generated srs for 28 and 27
    • Reduced the number of columns in the halo2 circut
    • Continued testing of aggregation circuit
    • Code Review for Nova-Bellman
    • Finish Code Review for Poseidon-Starky
    • Provide rough calculations for Halo2 SRS generations in discord.

vac:dr:

vac:rfc: