All items below are to be completed by the owner of the given release.
Note that `status.staging` refers to `shards.staging` fleet (rename is wip).
- [ ] Create release branch
- [ ] Assign release candidate tag to the release branch HEAD. e.g. v0.30.0-rc.0
- [ ] Generate and edit releases notes in CHANGELOG.md
- [ ]_End user impact_: Summarize impact of changes on Status end users (can be a comment in this issue).
- [ ]**Validate release candidate**
- [ ] Automated testing
- [ ] Ensures js-waku tests are green against release candidate
- [ ] Ask Vac-QA and Vac-DST to perform available tests against release candidate
- [ ]**On Waku fleets**
- [ ] Lock `waku.test` fleet to release candidate version
- [ ] Continuously stress `waku.test` fleet for a week (e.g. from `wakudev`)
- [ ] Search _Kibana_ logs from the previous month (since last release was deployed), for possible crashes or errors in `waku.test` and `waku.sandbox`.
- Most relevant logs are `(fleet: "waku.test" OR fleet: "waku.sandbox") AND message: "SIGSEGV"`
- [ ] Run release candidate with `waku-simulator`, ensure that nodes connected to each other
- [ ] Unlock `waku.test` to resume auto-deployment of latest `master` commit
- [ ]**On Status fleet**
- [ ] Deploy release candidate to `status.staging`
- [ ] Perform [sanity check](https://www.notion.so/How-to-test-Nwaku-on-Status-12c6e4b9bf06420ca868bd199129b425) and log results as comments in this issue.
- [ ] Connect 2 instances to `status.staging` fleet, one in relay mode, the other one in light client.
- [ ] 1:1 Chats with each other
- [ ] Send and receive messages in a community
- [ ] Close one instance, send messages with second instance, reopen first instance and confirm messages sent while offline are retrieved from store
- [ ] Perform checks based _end user impact_
- [ ] Ask other (Waku and Status) CCs to point their instance to `status.staging` for a week and use the app as usual.
- [ ] Ask Status-QA to perform sanity checks (as described above) + checks based on _end user impact_; do specify the version being tested
- [ ] Ask Status-QA or infra to run the automated Status e2e tests against `status.staging`
- [ ] Get other CCs sign-off: they comment on this PR "used app for a week, no problem", or problem reported, resolved and new RC
- [ ]**Get Status-QA sign-off**. Ensuring that `status.test` update will not disturb ongoing activities.
- [ ]**Proceed with release**
- [ ] Assign a release tag to the same commit that contains the validated release-candidate tag
- [ ] Create GitHub release
- [ ] Deploy the release to DockerHub
- [ ] Announce the release
- [ ]**Promote release to fleets**.
- [ ] Update infra config with any deprecated arguments or changed options
- [ ] [Deploy final release to `waku.sandbox` fleet](https://ci.infra.status.im/job/nim-waku/job/deploy-waku-sandbox)
- [ ] [Deploy final release to `status.staging` fleet](https://ci.infra.status.im/job/nim-waku/job/deploy-shards-staging/)
- [ ] [Deploy final release to `status.test` fleet](https://ci.infra.status.im/job/nim-waku/job/deploy-shards-test/) ([soon to be `status.prod`](https://github.com/status-im/infra-shards/issues/33))
- [ ]**Post release**
- [ ] Submit a PR from the release branch to master. Important to commit the PR with "create a merge commit" option.
- [ ] Update waku-org/nwaku-compose with the new release version.