# 0007. Feature toggles development
|
||
|
|
||
|
| Date | Tags |
|
||
|
|---|---|
|
||
|
| 2018-05-25 | development |
|
||
|
|
||
|
|
||
|
## Status
|
||
|
|
||
|
Proposed
|
||
|
|
||
|
## Context
|
||
|
|
||
|
This change describes a methodology of development which we believe will help
|
||
|
us increase the confidence and speed in the development process.
|
||
|
|
||
|
### What problem are we trying to solve
|
||
|
|
||
|
Currently the time between a PR is sent and the code gets merged is between 1 day
|
||
|
to in some case 4 to 5 days.
|
||
|
|
||
|
This has some disadvantages:
|
||
|
|
||
|
1) This workflow incentivises developers to make large PRs, as building
|
||
|
incrementally but having to wait 2 to 3 days for the code to be merged at each
|
||
|
step is not desirable and results in loss of context.
|
||
|
|
||
|
2) If a bug is introduced it is harder to fix, as the longer it takes to integrate code
|
||
|
the more likely the developer has lost familiarity with the code.
|
||
|
|
||
|
3) Constant rebases introduce an overhead for the developer and can introduce
|
||
|
subtle bugs, as rebased code is not thoroughly reviewed.
|
||
|
|
||
|
4) Code review is only performed once, but during the manual QA step significant
|
||
|
changes might be added, which are not reviewed anymore.
|
||
|
|
||
|
### How are we going to address it
|
||
|
|
||
|
We believe feature toggles development https://martinfowler.com/articles/feature-toggles.html
|
||
|
is a step in the right direction.
|
||
|
|
||
|
The way it would work is:
|
||
|
|
||
|
A developer starts working on a new feature.
|
||
|
Any new code will be scoped behind a feature flag and:
|
||
|
|
||
|
1) no significant changes are made to the existing codebase
|
||
|
2) no changes are visible to the user when the feature flag is off
|
||
|
|
||
|
In this case the manual QA step can be skipped, and the code can be integrated
|
||
|
as soon as the review step is done.
|
||
|
|
||
|
Clojure reviewers can object if they think the changes are so significant that
|
||
|
manual QA is required.
|
||
|
|
||
|
This process should ease some workload on the QA team and move some of the
|
||
|
responsibilities on clojure developers.
|
||
|
|
||
|
### What needs to change
|
||
|
|
||
|
To improve no bugs are introduced, there needs to be a concerted effort in
|
||
|
improving the current test suites, both e2e and clojure, and ensure new code is
|
||
|
sufficiently covered.
|
||
|
The shape/type of tests needed is open to discussion, but generally light
|
||
|
integration tests + light e2e tests are a good approach for this kind of workflow.
|
||
|
|
||
|
Also manual smoke testing of the images generated is necessary, until we are
|
||
|
more confident on our test suites.
|
||
|
|
||
|
Once the feature is to be toggled, a PR will be sent changing the config,
|
||
|
at which point manual QA will be required before merging.
|
||
|
|
||
|
If fixes are to be applied, they can be made in a separate PR, which can skip manual QA,
|
||
|
but will not skip code review, ensuring that subsequent changes are reviewed. Once those are
|
||
|
merged into develop, the PR that changes the feature toggle will resume testing.
|
||
|
|
||
|
|
||
|
### How far we want to go
|
||
|
|
||
|
At the most extreme, this workflow allows push-to-master, with multiple commits
|
||
|
a day being integrated, but this would hardly fit with the code-review process.
|
||
|
|
||
|
The idea is to add some rigour to the process so that the review step is meaningful,
|
||
|
essentially at any point it could be toggled on and it should provide **value** to the
|
||
|
end user.
|
||
|
|
||
|
This means that PRs that will skip manual QA need to be deliverables and
|
||
|
presentable to an end-user (no incomplete implementations), i.e. features
|
||
|
need to be split into meaningful chunks.
|
||
|
|
||
|
Not all code contributions will want to use this workflow, it is up to the developer
|
||
|
to decide.
|