- mention the "Privacy Policy" document in the text explaining "Help us
improve Status", make a link to it and display it in a separate popup
- add a standalone header button to the settings page, doing the same
- extend storybook page with the "placement" param
Fixes#16157
- this fixes 2 small regressions, namely in how we calculate the
background corner radius and icon size when in the mode of `isRoundIcon`
- the "Saved addresses" button in wallet's left view is very special on
its own; overall we have only 2 instances of this "round" icon buttons
in the whole app
Fixes#16156
- add a secondary "loading" state (`loadingWithText`), that is show the
loading indicator next to the text
- simplify the StatusBaseButton layout (esp. handling the overall
opacity/visibility)
- add a QML test suite; the code was becoming too complex and adding a
simple boolean prop was getting "dangerous"
- port the SwapModal to use the new `loadingWithText` property
Fixes#15313
* feat(metrics): add onboarding screen metrics and section navigation
Fixes#16100
Adds metrics for navigating to the different screens of the onboarding and when navigating to a new section while logged in; only when enabled of course.
I refactored the code a little to make it simpler. I moved the check to see if the metrics collection is enabled in the async task itself, so we don't have to check it each time we add a new metric
* fix metric sent from module
* review comments
* add flowtype
- make it possible to configure the locale of the validator
- use the correct default decimal point in AmountValidator
- update/add the relevant tests for AmountToSendNew
WalletConnect cannot operate on shared cookies in between accounts. This commit will split the cookies and cache in different folders with the user public key as folder name.
1. The DAppsListProvider needs to receive all the user accounts so that it can process all dapps the user is connected to (the dapps filtering based on selected account is an internal impl. detail)
2. Call `revokeSession` on disconnect only if the dapp cannot be found in the WC active sessions. There is some overlapping between Browser connector and Wallet connect because both operate on the same data stored in the DB. If Browser connector controller removes WC data, the WC disconnect flows cannot be successfully completed.
3. Reuse the same notification flow for Browser connector as it's used for WC
4. Fix dapp filtering when processing the dapps that will be displayed in the UI.
(cherry picked from commit 21227893c2)
- manage the lifetime of the Custom tab button dynamically; setting the
tab button to `visible: false` doesn't unfortunately remove it from the
tab bar
Fixes#16052
- make the StatusBetaTag highlighted when used inside an active/checked
StatusSwitchTabButton
- simplify the components, get rid of MouseArea just for the sake of
setting the cursorShape
In some rare cases hiding collectibles was causing segfault, related to
checking if all timestamps are available. Combination of 2 SFPMs with
the same source and Aggregator working on those models. Additionally
filters/sorters were depending on the Aggregator value. The minimal
crashing sample has been isolated to be investigated in a separate
ticket. In this commit aggregator's value is applied in a deferred way
via Qt.callLater, fixing the issue.
Closes: #15775
Added limitations:
- allowed adding of max 20 accounts
- allowed adding of max 3 watch only accounts
- allowed adding of max 5 key pairs (including the profile key pair)
- allowed adding of max 20 saved addresses per mode
Closes#15934
The disconnect notifications were operating on `WalletConnectService.currentSessionProposal`. This object stores the current session object on connect, but it's not necessarily the same session the user wants to disconnect.
To fix this I'm getting the active sessions from status-go when the disconnect request is received (from Status or dapp). If the topic matches to any connection topic owned by the users accounts we'll show a notification.
(cherry picked from commit fea4e8ed76)
- completely removes the `ui/app/AppLayouts/Browser` QML app section
- removes the `app_service/service/bookmarks`,
`app/modules/main/browser_section` and
`src/app_service/service/dapp_permissions` NIM modules
- remove the Browser settings page and associated popups/components
- HTML links now always open in an external browser
- adjust the section indexes in `Constants`
- fixup the e2e tests
Fixes#14614
1. Hiding DApps button on not supported wallet account selection
2. Filtering DApps in connected dApps list based on account selection
closes: #15589closes: #15647
- display additional beta information as a tooltip
- don't overlap the Beta badge with the unread msg indicator
- some minor cleanups & fixes
Fixes#15795Fixes#15929
- remove the nested unneeded ScrollView
- cleanups and fixes in mocked models and stores to unbreak showing the
networks/routing in storybook
Fixes#15902
- format Big decimal numbers correctly according to the current locale;
some precisions loss is tolerated here for the display purposes
- fixes wrong decimal separators in some places and aligns with the
standard in terms of number of decimals, as everywhere else in the app
Fixes#15612Fixes#15790
- partially reuse the already available Global/Popups methods to hide
assets (which also emit proper notifications); those are needed as
anotehr shared modal from Popups uses it too (may come from outside of
Wallet)
- some warnings cleanup in the controller
Fixes#15777
Add a new NetworkChecker QObject to StatusQ to be used in checking
internet connection status. This is used by the WebEngineLoader
to only allow loading of web pages when there is an active internet
to cover for a corner case on MacOS where the internet connection is
not reestablished if the WebEngineView was loaded without an active
internet connection.
Closes: #15598, #15806
- set the correct widths and elide mode
- fixup the visuals of the NetworkFilter combo box (to disable it w/o
making it look disabled)
- fix passing the connection status down to DAppCard
* Disable the send button when the router returns errors.
* Display a red arrow on networks lacking sufficient gas for the transaction.
Closes#15700#15701
- This commit temporarily disables the MaxAmount button in the `SwapInputPanel` and `SendModal` components.
- The MaxAmount button will be reintroduced with the correct behavior in issue #15709 for the 2.31 release.
closes: #15710
The requirements are that we allow all available networks
to Wallet Connect
Also temporarily disable the tests that validate selection working
Closes: #15638
The static url validation state `Pairing.errors.ok` was directly
responsible for the validation action in UX. With current change
the validation is now based on the pairing response. When the
pairing response is received the UX is validated and after half second
UX is moved to the approval process (`ConnectedDAppModal`)
Closes: #15591
We have no easy way to check the protocol and provide a customized
error message. Therefore we generalizes the error message to network
not supported.
Closes: #15649
- just use the `model.stickers` to access the submodel, remove dead NIM
code
- make sure that the installed sticker packs are loaded, even before
first opening the Sticker popup
- StatusStickerMarket: fix the back button
- fix launching the Buy stickers modal (SendModal)
Fixes#15718
- when we arrive to a point when all input params are empty, disable the
middle Exchange button
- add QML test for the Exchange button enabled/disabled state
Fixes#15751
Add helper function to filter out dApps with sessions that don't
have any supported account in the available accounts list.
Use helper function to filter out dApps connected on other profiles
when listing dApps in the dApps list.
When disconnecting an app only disconnect sessions for the current
profile.
Closes: #14888, #15707
Also
- don't report error in case of status-go returning nil instead
of an empty array.
- fix misleading alias to AmountsArithmetic
- minor improvements requested in previous discussions
Updates: #15707
Adding local setting: metrics_popup_seen
Small refactoring: showing popup from main.qml
Showing popup: 1. on welcome screen, 2. in Settings/Privacy page and 3. after login when the popup has not been shown yet
Issue #15628
Add new settings page for metrics management - Privacy and security
Add popup to enable/disable metrics on Onboarding and Privacy screens
Add MetricsStore in QML
Issue #15490
Reverts changes introduced by 6eeb91 the connector integration
that were loading the SDK asynchronously. Not sure why it isn't working
though.
Closes: #15694
Also differentiate between l1 and l2 fees and check them against the
specific chain balance
Also
- Included tests for the new functionality
- Fixed some inconsistencies in handling types
Updates: #15552
Fixes#15507
Makes sure to enable the network where the owner token was minted before minting or airdroping a token.
This makes sure that the account selector shows the right balance and there is no ETH error before doing the transation
fix#15179 that triggers connection request from client
- Setup the initial architecture for connecting Status-go and UI
screens
- Implement the request Connection popup for Accept or Rejecting
connection
Fixing a bug where the community name is not shown in the `Send` button
Get the collectible community name from the community model for community tokens. Otherwise default to community id.
+ Fix WalletFooter layout when the buttons text exceeds the available width
to squash: Fixing send on owner token - name
1. Show Send Button on wallet footer when all accounts is selected
2. Hide Send Button in collectibles context menu and collectibles details view when the collectible is not owned by the user
3. Disable the Send Button in collectibles context menu and collectibles details view when the collectible is soulbound
to squash: Fine tune send action on collectibles
to squash: Fine tune send on collectibles
to squash: Fine-tune collectibles
Updating the SendModal to receive an accountAddress to preselect the account instead of the account item model
to squash: Fix account selection. by address
The root cause of this issue is the improper computation of the `accountBalance` expression role in the accounts model. Its value depends on another model (`filteredBalancesModel`) and by the time the expression role gets computed the proper `balance ` is not ready in the `filteredBalancesModel`.
This is a quick fix, but maybe the real fix should be restructuring the adapter and the model dependencies. I'd look out for any `ModelUtils` usage and replace it with a declarative approach if possible.
In comparison to the previous version it provides simpler API
and better validation based on AmountValidator.
Old version will be removed after full integration of the new version.
Replace missing methods calls of chart after it was replaced with a different
component.
Update chart on networks change.
Fix data for all chains requested - both test and real networks.
Fix some unrelated qml errors
Compute max fees for transaction related requests and display the
results to user.
Also:
- Add helper to convert from hex (backend) to decimal (frontend) values.
- Add helper to convert from float gwei to hex wei
- Update tests to accommodate for the new dependencies.
Sourcing of account balances is not included therefore the transaction is
allowed to go through even if the account balance is insufficient. An error
will be generated by the backend in this case.
Updates: #15192
Fixes#15614
* feat(StatusQ): add StatusExperimentalTag component and page
* chore(beta): add beta tag to ENS
* chore(beta): add beta tag to Activity tab
* chore(beta): add beta tag to wallet settings
* chore(beta): add beta tag to Notification Center