Cross-Team Epic Delivery Workflow

This guide documents the optimal steps to create and work on Feature Epics in a collaborative way.

Table of Contents

1. Epic Creation (Product / Dev / Design)

  • An EPIC is created for any new feature or major improvement (by product, dev or design teams).
  • The EPIC includes:
    • Feature requirements
    • High-level scope
    • Known constraints or assumptions
  • The epic is assigned to the Design Team with the label needs-design.

2. Design Exploration Phase

  • The designer changes the Epic status to “In Progress” once exploration begins.
  • The designer starts drafting early concepts / prototypes.
  • The designer is responsible for pinging the Dev owner early to initiate collaboration.
  • Multiple review iterations may happen with:
    • Dev / Product / QA engineers
  • Syncs may be:
    • Async (chat / comments) / Sync calls, as needed
  • Communication should be frequent, potentially more than once per week for complex features.

3. Final Design Approval & Handoff

  • Last meeting to present the final design
  • Once iterated and aligned, the final design direction is agreed by:
    • Design / Product / Dev
  • The designer prepares and delivers the Figma handoff package.
    • Includes adding a link to the Figma files to the Epic's description.
  • The designer removes the needs-design label from the epic.
  • The designer pings the Dev team (in the same epic) to indicate the feature is ready for implementation.

4. Development Planning

  • The Dev owner reviews the final design.
  • The Dev owner breaks down the epic into small, actionable subtasks.
  • Subtasks include:
    • UI components / Interactions / Edge states
    • Integration work
    • Non-visual logic affected by UI
    • Automation test to be implemented by a QA engineer
    • Design QA task
  • The Dev owner assigns subtasks within the team (if needed) and starts implementation.
  • It should have acceptance criteria

5. Design QA (Post-Implementation Review)

  • Once the implementation is complete, Dev notifies Design and put the Status as QA.
  • Designer reviews the built feature to ensure:
    • Visual fidelity
    • Correct interactions
    • Proper responsive handling
    • Consistency with the agreed design
  • Designer to document all found issues in the Pull Request.
  • Any necessary follow-ups are captured as subtasks and addressed by Dev.

6. Epic Completion

  • When:

    • All dev subtasks are done
    • Design QA is approved
    • Product is aligned
  • The epic is marked as Completed and closed.

TLDR Summary Workflow (High-Level)

  1. Epic created -> assigned to Design with needs-design
  2. Design exploration -> prototypes -> early dev syncs
  3. Final design agreed -> Figma delivered -> needs-design label removed -> dev notified
  4. Dev decomposes work -> implements subtasks
  5. Design QA -> fixes -> approval