* Bump BLSCurve
* Use unified aggregation API
* use new blscurve with unified aggregate API
* bump
* fix toRaw
* replace state_sim combine with AggregateSignature
* Fix 32-bit
* Fix 32-bit for real and test deactivating ccache for fno-tree-lopp-vectorize flag
* change compilation switches to narrow down Linux issue
* Use -fno-tree-vectorize to disable both tree-loop-vectorize and tree-slp-vectorize
* blscurve now disables both Loop and SLP vectorization
* Add tests for the miracl/milagro fallback
* Travis has max log size of 4MB
* Test with Miracl in the finalization test
* fix state_sim log level
* Coment out the slow fallback tests
* don't kill the program if not connected to a bootstrap node within 30 seconds
* recover faster from loss of network connectivity
* connectWorker(): sleep 1s between dials
* launch_local_testnet.sh: increase BOOTSTRAP_TIMEOUT
* don't use metric value in program logic
* refactor some ungainly variable names
Since I'm not able to reproduce the finalization failure locally
and it does happen only sporadically, one possible explanation is
that the introduction of keystores lead to a slower initialization
of the beacon nodes which somehow interferes with their behavior
during the initial slots.
If increasing the start-up delay fixes the problems, the hypothesis
will be confirmed.
- moved "process_dashboard.nim" in "tools/"
- README: made Witti the documented testnet and added instructions for
getting metrics out of the local node
- moved Prometheus config file generation in its own script
- the static Grafana dashboard definition now covers all nodes, using
a variable; only the remote testnet dashboards need to be dynamically
generated
- "launch_local_testnet.sh" no longer needs a "--grafana" option
* Jenkins: add timeouts to testnet finalisation tests
- add nicer child process management to "launch_local_testnet.sh"
- correct a comment in "start.sh"
* the Jenkins worker's version of "timeout" doesn't support "-v"