Local testnet simulation currently waits 5 seconds when starting each
individual Geth instance. Waiting a shorter amount saves almost a minute
per minimum + mainnet CI finalization job.
Measured startup times per Geth: Linux ~100ms, macOS Intel ~300ms.
Launching multiple local testnet simulation sequentially can lead to
existing EL processes from prior failed/aborted runs not being stopped
properly, subsequently leading to hard-to-debug CI test failures.
Fixing the cleanup logic addresses this problem.
The `eth1_monitor` check to require engine API from bellatrix onward
has issues in setups where the EL and CL are started simultaneously
because the EL may not be ready to answer requests by the time that the
check is performed. This can be observed, e.g., on Raspberry Pi 4 when
using Besu as the EL client. Now that the merge transition happened, the
check is also not that useful anymore, as users have other ways to know
that their setup is not working correctly (e.g., repeated exchange logs)
When the BN-embedded LC makes sync progress, pass the corresponding
execution block hash to the EL via `engine_forkchoiceUpdatedV1`.
This allows the EL to sync to wall slot while the chain DAG is behind.
Renamed `--light-client` to `--sync-light-client` for clarity, and
`--light-client-trusted-block-root` to `--trusted-block-root` for
consistency with `nimbus_light_client`.
Note that this does not work well in practice at this time:
- Geth sticks to the optimistic sync:
"Ignoring payload while snap syncing" (when passing the LC head)
"Forkchoice requested unknown head" (when updating to LC head)
- Nethermind syncs to LC head but does not report ancestors as VALID,
so the main forward sync is still stuck in optimistic mode:
"Pre-pivot block, ignored and returned Syncing"
To aid EL client teams in fixing those issues, having this available
as a hidden option is still useful.
* Fixes a segfault during block production when the Keymanager API
is disabled. The Keymanager is now disabled on half of the local
testnet nodes to catch such problems in the future.
* Fixes multiple potential stalls from REST requests being done
without a timeout. From practice, we know that such requests
can hang forever if not cancelled with a timeout. At best,
this would be a resource leak, at worst, it may lead to a
full stall of the client and missed validator duties.
* Changes some Options usages to Opt (for easier use of valueOr)
* Keymanager API for the validator client
* Properly treat the 'description' field as optional when loading Keystores
* Spec-compliant serialization of the slashing data in Keymanager's DeleteKeys response ()
Fixes#3940Fixes#3964Closes#3884 by adding test
* packaging updates
* one package per binary (nimbus_beacon_node, nimbus_validator_client)
* use `-` in package name (`_` is separating the version)
* don't include (un)installation scripts in package
* default metrics port 8108 for vc
* fix several upgrade/install errors in scripts
* add JWT option to service files
* don't attempt to remove user on purge
* Use final `v1` version for light client protocols
* Unhide LC data collection options
* Default enable LC data serving
* rm unneeded import
* Connect to EL on startup
* Add docs for LC based EL sync
The ports for the concurrently executing REST and Minimal testnet clash,
leading to some CI failures since #3827 introduced further concurrency.
Adjusting the ports to be distinct across various tests should fix this.
Adds the `--web3-url` launch argument to `nimbus_light_client` to enable
driving the EL with the optimistic head obtained from LC sync protocol.
This will keep issuing `newPayload` / `forkChoiceUpdated` requests for
new blocks, marking them as optimistic. `ZERO_HASH` is reported as the
finalized block for now.
`a48d741022f6b0da1bb679e0ede4e38c019242cf` disabled LC in local testnet
as an undocumented side effect. Re-enabling for more thorough testing,
and added handling of LC with `--eth2-docker-image`.
* remove web3 url prompt in launcher script
The interactive prompt for web3 has outlived its utility as we now load
url:s from command line params and config files, preventing the prompt
from correctly detecting when it's needed.
Also, after the merge, a JWT secret will (likely) be needed.
* log notice when web3 url is missing
* fix docs to not mention default that doesn't exist
* fix scripts to properly quote arguments
* Add support for launching Geth and Nimbus-eth1 nodes in launch_local_simulation
* Prevent undefined variables errors when Nimbus and Geth are not launched
Co-authored-by: Nikolay Mitev <github@hmel.org>
* systemd: use same service file as package
* systemd: recommend setting up a user
* clean up obsolete / ephemeral notes
* eth1 -> execution, in many places
* clean up docker instructions to match the experience of running the
runner script
* add basic instructions / links for execution clients other than geth
* clear a few more references to JSON-RPC, update to REST
* update hardware requirements with execution client extras
* start talking about merge requirements (this needs a dedicated page)
* note that binaries do exist, where relevant
* list gitcoin under donations
* update syncing docs
* `NOT` is for `NOTICE` in logs
* update rpi hardware recommendations
* prevent automatic doppelganger restarts in systemd service file
For consistency with other options, use a common prefix for light client
data configuration options.
* `--serve-light-client-data` --> `--light-client-data-serve`
* `--import-light-client-data` --> `--light-client-data-import-mode`
No deprecation of the old identifiers as they were only sparingly used
and all usage can be easily updated without interferance.
When querying `ALTAIR_FORK_EPOCH` fails, the `launch_local_testnet`
script got stuck because comparing `CURRENT_FORK_EPOCH` against it
would keep failing with `[: : integer expression expected`.
Querying `ALTAIR_FORK_EPOCH` is now retried until a number is returned.
When launched with `--light-client-enable` the latest blocks are fetched
and optimistic candidate blocks are passed to a callback (log for now).
This helps accelerate syncing in the future (optimistic sync).