Tests have been moved to the Makefile and the test binaries are built in
parallel.
The Nim compilation scheme has been moved to a script and adapted to
work with different binaries being built in parallel from the same main
source file (think minimal/mainnet tests).
* Create CLI tool for slashing export
* Use SQLite as a DB instead of a KV-store
* Keeps v1 and v2 DBs around
* Uses the same schema as Lighthouse v1.1.0
* Passes all interchange tests + skeleton of finalization pruning
* Removes tests that would violate v5 / minimal slashing DB and MinSlot rules
* Migration tool added using low-watermark scheme for faster migration of large number of validators
* bump submodules
* undo a couple of bumps (32-bit failure)
* launch_local_testnet.sh: timeout and various fixes
* undo nim-http-utils bump (breaks RPC for VC)
* Concentrate all sensitive writeFile/createPath calls in one place.
Fix eth2_network_simulation for Windows.
* Remove artifacts.
* fix import
Co-authored-by: Jacek Sieka <jacek@status.im>
* update ve1.0.0-rc.0 preset spec references
* remove runtime preset ETH1_FOLLOW_DISTANCE from preset files; remove two CI build items to try to keep Travis from timing out
* run logtrace in finalization CI
* use specified DATA_DIR rather than assuming default
* convert rest of hardcoded local_testnet_data references
* logtrace asr needs DEBUG-level logs
* clean up some shell (not) quoting issues
* add --enable-logtrace argument to launch_local_testnet
* scan for all available logfiles
* remove specific filename references
* update v0.11.3 spec ref to v0.12.2
* Bump BLSCurve
* Use unified aggregation API
* use new blscurve with unified aggregate API
* bump
* fix toRaw
* replace state_sim combine with AggregateSignature
* Fix 32-bit
* Fix 32-bit for real and test deactivating ccache for fno-tree-lopp-vectorize flag
* change compilation switches to narrow down Linux issue
* Use -fno-tree-vectorize to disable both tree-loop-vectorize and tree-slp-vectorize
* blscurve now disables both Loop and SLP vectorization
* Add tests for the miracl/milagro fallback
* Travis has max log size of 4MB
* Test with Miracl in the finalization test
* fix state_sim log level
* Coment out the slow fallback tests
* don't kill the program if not connected to a bootstrap node within 30 seconds
* recover faster from loss of network connectivity
* connectWorker(): sleep 1s between dials
* launch_local_testnet.sh: increase BOOTSTRAP_TIMEOUT
* don't use metric value in program logic
* refactor some ungainly variable names
- testnets can now be launched with a separate validator client - make altona SCRIPT_PARAMS="--separateVC"
- reverted the ctrl+C signal handler code reuse - not necessary for the VC anyway (default is good enough)
- added a bit more logging in the VC
- removed unnecessary code in the VC - connect() just parses the address & port...
- fixed a couple more VC issues - when fetching the duties for an epoch fails on the BN side ==> the VC shouldn't be left in a broken state
- documented the currently supported json-rpc endpoints
- added more checks on the BN side for the API - bounds-checking the requests & also checking if the BN itself is synced
- other cleanup
currently a local sim doesn't finalize, but participation in the altona network with a separate VC is painless and works just as well as with in-process validators in a BN
- remove `--dev-build` option
- unconditionally write the "nbc.log" file, but do it after a chdir to
dataDir because Chronicles doesn't seem to support proper paths for
"file(...)" in sink definitions
- change base RPC port (9090 -> 9190) because 9090 is the default
Prometheus daemon listening port
Since I'm not able to reproduce the finalization failure locally
and it does happen only sporadically, one possible explanation is
that the introduction of keystores lead to a slower initialization
of the beacon nodes which somehow interferes with their behavior
during the initial slots.
If increasing the start-up delay fixes the problems, the hypothesis
will be confirmed.
- moved "process_dashboard.nim" in "tools/"
- README: made Witti the documented testnet and added instructions for
getting metrics out of the local node
- moved Prometheus config file generation in its own script
- the static Grafana dashboard definition now covers all nodes, using
a variable; only the remote testnet dashboards need to be dynamically
generated
- "launch_local_testnet.sh" no longer needs a "--grafana" option
The first offset of an SSZ object should always have a fixed constant
value. Otherwise, some unused bytes may appear between the fixed portion
and the dynamic portion.
Please note that this fix shutds down the minimal forward compatibility
currently supported by the SSZ format (and thus, the expected behavior
must be clarified in the SSZ spec).