* Implement engine_getClientVersionV1
* full git revision string
* Limit GitRevisionString to 8 chars
* Fixes
* Debug windows CI
* debug windows ci
* produce git revision using -C
* try not to delete .git folder in windows ci
* Harden GitRevision procuration
* Add double quotes to git -C param
* Escape sourcePath
* Remove double quotes from git -C param
* Add nph check to fluffy CI lint
* Add a section on nph usage in the fluffy.guide
* Update copyright years for altered files
* Avoid chained methods formatting style in db code
* Update nph in CI to v0.5
* Remove leftover commented import
* Move comment to avoid nph turning complex list into simple list (nph bug)
* Update nph in CI to v0.5.1
* Formatting fluffy with nph v0.5.1
* Add nph check to nimbus_verified_proxy CI lint
* Formatting nimbus_verified_proxy code with nph v0.4.1
* Update copyright years
* Change order of nph check vs copyright check
* Nimbus light client integration with status-go
* Add cleanup code, address review comments
* Disable metrics for libverifproxy only
* Update confutils
* missing import
* build proxy in tests
* more build stuff
* namespace make vars
* export NimMain for windows
* reduce dependency on Nim compiler in header file
* copyright
---------
Co-authored-by: Vitaliy Vlasov <siphiuel@protonmail.com>
Co-authored-by: Jacek Sieka <jacek@status.im>
With this schedule the new fluffy Docker build should be available
before public portal-hive tests are run. Else, we get an extra day
of delay to see the results of the current latest.
- Fix deprecated warning form github related to set-output.
- Add stable download file name such as 'nimbus-eth1_${OS}_${ARCH}_nightly_latest.tar.gz'.
- Use releaser andelf/nightly-release action to replace old flaky action.
previously, the withdrawal validation is in process_block only,
but the one in persist block, which is also used in synchronizer
is not validated properly.
* Bump nimbus-eth2 and fix beacon LC related changes
* Disable local_testnet test in CI
Latest version is no longer compatible with the old nightlies that are being downloaded for the test
to avoid conflict because if testutp using ubuntu-latest
cached Nim compiler will be used by linux test which is using
ubuntu 20.04, then missing glibc 2.33 error. ubuntu 20.04 still
using glibc 2.31
Two unresolved items currently:
- Three tests that are temporarily disabled as they fail in the
macro_assembler code, which seems to be due to an ambigious
identifier Stop (Ops and chronos ServerCommand enum).
- i386 CI disabled as it fails at Nim compilation already. Failed
tests where already ignored for this target.
* Cosmetics, update logger `topics`
* Clean up sync/start methods in nimbus
why:
* The `protocols` list selects served (as opposed to sync) protocols only.
* The `SyncMode.Default` object is allocated with the other possible sync
mode objects.
* Add snap service stub to `nimbus`
* Provide full set of snap response handler stubs
* Bicarb for the latest CI hiccup
why:
Might be a change in the CI engine for MacOS.
* Change Light client proxy naming to verified proxy naming in code
* Rename the lc_proxy files to the verified proxy naming
* Update to the verified proxy name in the docs