nim-dagger/tests/codex/sales/helpers
markspanbroek b3e57a37e2
Wire up prover (#736)
* wire prover into node

* stricter case object checks

* return correct proof

* misc renames

* adding usefull traces

* fix nodes and tolerance to match expected params

* format challenges in logs

* add circom compat to solidity groth16 convertion

* update

* bump time to give nodes time to load with all circom artifacts

* misc

* misc

* use correct dataset geometry in erasure

* make errors more searchable

* use parens around `=? (await...)` calls

* styling

* styling

* use push raises

* fix to match constructor arguments

* merge master

* merge master

* integration: fix proof parameters for a test

Increased times due to ZK proof generation.
Increased storage requirement because we're now hosting
5 slots instead of 1.

* sales: calculate initial proof at start of period

reason: this ensures that the period (and therefore
the challenge) doesn't change while we're calculating
the proof

* integration: fix proof parameters for tests

Increased times due to waiting on next period.
Fixed data to be of right size.
Updated expected payout due to hosting 5 slots.

* sales: wait for stable proof challenge

When the block pointer is nearing the
wrap-around point, we wait another period
before calculating a proof.

* fix merge conflict

---------

Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>
2024-03-12 12:10:14 +00:00
..
periods.nim Wire up prover (#736) 2024-03-12 12:10:14 +00:00