* rework cli to accept circuit params
* check circom files extension
* adding new required cli changes
* don't use ufcs
* persistence is a command now
* use `nimOldCaseObjects` switch for nim confutils compat
* misc
* Update cli integration tests
* Fix: simulateProofFailures option is not for validator
* moving circom params under `prover` command
* update tests
* Use circuit assets from codex-contract-eth in tests
* Add "prover" cli command to tests
* use correct stores
* make `verifier` a cmd option
* update circuit artifacts path
* fix cli tests
* Update integration tests to use cli commands
Integration tests have been updated to use the new cli commands. The api for usage in the integration tests has also changed a bit.
Proofs tests have been updated to use 5 nodes and 8 blocks of data. The remaining integration tests also need to be updated.
* remove parsedCli from CodexConfig
Instead, parse the cli args on the fly when needed
* remove unneeded gcsafes
* graceful shutdowns
Where possible, do not raise assert, as other nodes in the test may already be running. Instead, raise exceptions, catch them in multinodes.nim, and attempt to do a teardown before failing the test.
`abortOnError` is set to true so that `fail()` will quit immediately, after teardown has been run.
* update testmarketplace to new api, with valid EC params
---------
Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>