nim-dagger/tests/integration/nodeconfigs.nim

12 lines
217 B
Nim
Raw Permalink Normal View History

Prover CLI updates (#735) * rework cli to accept circuit params * check circom files extension * adding new required cli changes * don't use ufcs * persistence is a command now * use `nimOldCaseObjects` switch for nim confutils compat * misc * Update cli integration tests * Fix: simulateProofFailures option is not for validator * moving circom params under `prover` command * update tests * Use circuit assets from codex-contract-eth in tests * Add "prover" cli command to tests * use correct stores * make `verifier` a cmd option * update circuit artifacts path * fix cli tests * Update integration tests to use cli commands Integration tests have been updated to use the new cli commands. The api for usage in the integration tests has also changed a bit. Proofs tests have been updated to use 5 nodes and 8 blocks of data. The remaining integration tests also need to be updated. * remove parsedCli from CodexConfig Instead, parse the cli args on the fly when needed * remove unneeded gcsafes * graceful shutdowns Where possible, do not raise assert, as other nodes in the test may already be running. Instead, raise exceptions, catch them in multinodes.nim, and attempt to do a teardown before failing the test. `abortOnError` is set to true so that `fail()` will quit immediately, after teardown has been run. * update testmarketplace to new api, with valid EC params --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com> Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>
2024-03-12 09:57:13 +00:00
import pkg/questionable
import ./codexconfig
import ./hardhatconfig
type
NodeConfigs* = object
clients*: ?CodexConfigs
providers*: ?CodexConfigs
validators*: ?CodexConfigs
hardhat*: ?HardhatConfig