Eric 3212c3cf30
parallel tests running
- need to test with longer tests to ensure the parallelisation is truly happening
- is the +10 hardhat port needed?
- try with more integration tests

# Conflicts:
#	tests/integration/hardhatprocess.nim
#	tests/integration/multinodes.nim
#	tests/integration/testcli.nim
#	tests/testIntegration.nim
2025-01-22 15:46:51 +11:00

25 lines
887 B
Nim

import pkg/chronos
import pkg/codex/logutils
proc nextFreePort*(startPort: int): Future[int] {.async: (raises:[CancelledError]).} =
proc client(server: StreamServer, transp: StreamTransport) {.async.} =
await transp.closeWait()
var port = startPort
while true:
trace "checking if port is free", port
try:
let host = initTAddress("127.0.0.1", port)
# We use ReuseAddr here only to be able to reuse the same IP/Port when
# there's a TIME_WAIT socket. It's useful when running the test multiple
# times or if a test ran previously using the same port.
var server = createStreamServer(host, client, {ReuseAddr})
trace "port is free", port
await server.closeWait()
return port
except TransportOsError:
trace "port is not free", port
inc port
except TransportAddressError:
raiseAssert "bad address"