* wire prover into node
* stricter case object checks
* return correct proof
* misc renames
* adding usefull traces
* fix nodes and tolerance to match expected params
* format challenges in logs
* add circom compat to solidity groth16 convertion
* update
* bump time to give nodes time to load with all circom artifacts
* misc
* misc
* use correct dataset geometry in erasure
* make errors more searchable
* use parens around `=? (await...)` calls
* styling
* styling
* use push raises
* fix to match constructor arguments
* merge master
* merge master
* integration: fix proof parameters for a test
Increased times due to ZK proof generation.
Increased storage requirement because we're now hosting
5 slots instead of 1.
* sales: calculate initial proof at start of period
reason: this ensures that the period (and therefore
the challenge) doesn't change while we're calculating
the proof
* integration: fix proof parameters for tests
Increased times due to waiting on next period.
Fixed data to be of right size.
Updated expected payout due to hosting 5 slots.
* sales: wait for stable proof challenge
When the block pointer is nearing the
wrap-around point, we wait another period
before calculating a proof.
* fix merge conflict
---------
Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>
* don't pass erasure
* use correct stores and construct erasure inside the node
* fix tests to match new constructor
* remove prover argument
* review commets
* revert failing on no-prover for now
* small cleanup
* comment out invalid proofs broken test