Update Vault/Nomad versions to ensure we're testing all the latest versions.
Update Vault/Nomad versions to ensure we're testing all the latest versions .
Unlike the Nomad tests (where Nomad is compiled from source and provides
the tests), Vault is installed as a binary, and local Consul tests are
run.
Fixes incorrect version change introduced in #20058.
ci: Set Go version consistently via .go-version
Ensure Go version is determined consistently for CI and Docker builds
rather than spread across several different files.
The intent is to eventually replace this with use of the `toolchain`
directive in Go 1.21.
Due to the unintuitive behavior of GHA w.r.t. implicit status check
`success()`, test results were only being uploaded on success (failures
presumably came from retried tests that passed).
This updates the testing/deployer (aka "topology test") framework to conditionally
configure and launch catalog constructs using v2 resources. This is controlled via a
Version field on the Node construct in a topology.Config. This only functions for a
dataplane type and has other restrictions that match the rest of v2 (no peering, no
wanfed, no mesh gateways).
Like config entries, you can statically provide a set of initial resources to be synced
when bringing up the cluster (beyond those that are generated for you such as
workloads, services, etc).
If you want to author a test that can be freely converted between v1 and v2 then that
is possible. If you switch to the multi-port definition on a topology.Service (aka
"workload/instance") then that makes v1 ineligible.
This also adds a starter set of "on every PR" integration tests for single and multiport
under test-integ/catalogv2
* Explicit container test
* remove static resources
* fix passing serviceBindPorts
* WIP
* fix explicit upstream test
* use my image in CI until dataplane is fixed.
* gofmt
* fixing reference to v2beta1 in test-containers
* WIP
* remove bad references
* add missing license headers
* allow access internal/resource/resourcetest
* fix check-allowed-imports to append array items
* use preview image for dataplane
* revert some inadverntent comment updates in peering_topology
* add building local consul-dataplane image to compatibility-tests CI
* fix substitution in CI
* change upstreams to destinations based on incoming change
* fixing use of upstreams in resource update
* remove commented out lines and enable envoy concurrency on dataplane.
* changes to addess PR feedback
* small fixes
---------
Co-authored-by: Eric <eric@haberkorn.co>
* bump testcontainers-go from 0.22.0 and remove pinned go version in integ test
* go mod tidy
* Replace deprecated target.Authority with target.URL.Host
Revert "NET-4996 - filter go-tests and test-integration workflows from running on docs only and ui only changes (#18236)"
This reverts commit a11dba710e.
### Description
The following jobs started failing when go 1.20.6 was released:
- `go-test-api-1-19`
- `go-test-api-1-20`
- `compatibility-integration-tests`
- `upgrade-integration-tests`
`compatibility-integration-tests` and `compatibility-integration-tests`
to this testcontainers issue:
https://github.com/testcontainers/testcontainers-go/issues/1359. This
issue calls for testcontainers to release a new version when one of
their dependencies is fixed. When that is done, we will unpin the go
versions in `compatibility-integration-tests` and
`compatibility-integration-tests`.
### Testing & Reproduction steps
See these jobs broken in CI and then see them work with this PR.
---------
Co-authored-by: Chris Thain <32781396+cthain@users.noreply.github.com>
* Ensure that git access to private repos uses the ELEVATED_GITHUB_TOKEN
* Bump the runner size for the protobuf generation check
This has failed previously when the runner process that communicates with GitHub gets starved causing the job to fail.