Hi, I'm a bot! This change was automatically merged because:
- It only modifies existing Draft or Last Call EIP(s)
- The PR was approved or written by at least one author of each modified EIP
- The build is passing
Hi, I'm a bot! This change was automatically merged because:
- It only modifies existing Draft or Last Call EIP(s)
- The PR was approved or written by at least one author of each modified EIP
- The build is passing
Hi, I'm a bot! This change was automatically merged because:
- It only modifies existing Draft or Last Call EIP(s)
- The PR was approved or written by at least one author of each modified EIP
- The build is passing
Hi, I'm a bot! This change was automatically merged because:
- It only modifies existing Draft or Last Call EIP(s)
- The PR was approved or written by at least one author of each modified EIP
- The build is passing
* Calldata gas cost reduction
Added a draft of EIP to reduce the gas cost of Calldata
* changed name to 2028
* Added EIP-2028 to meta eip-1679
* Added discussion url
* edited 'motivation' & 'specification'
Edited motivation to increase readability.
Edited specification to clarify terms.