The draft pull request shall be updated with summaries of the decisions around the hard fork. It should move in to the `Accepted` state once the changes are frozen (i.e. all referenced EIPs are in the `Accepted` state) and in to the `Final` state once the hard fork has been activated.
The Yellow Paper must be kept updated with the hard fork changes. It could either refer to the fork codename or the EIP number of the fork. The hard fork cannot be activated before the Yellow Paper is updated.
A meta EIP for coordinating the hard fork should help in visibility and traceability of the scope of changes as well as provide a simple name and/or number for referring to the proposed fork.
## Copyright
Copyright and related rights waived via [CC0](https://creativecommons.org/publicdomain/zero/1.0/).