488 Commits

Author SHA1 Message Date
Eric
dca40e0682
fix hardhat running on windows
Solution was two-fold:
1. Run the hardhat.cmd script instead of hardhat
2. Use the absolute path to the script executable instead of relative to the working directory
2025-06-05 15:58:00 +10:00
Eric
7c248b45ab
Bubble errors from hardhat start
- bubble errors from hardhatprocess.start (instead of just logging)
- push raises: [] in all nodeprocess procs/methods to avoid leaking `Exception` exception types in method overrides
2025-06-05 15:58:00 +10:00
Eric
52479ef0e8
nil check hardhat process before stopping 2025-06-05 15:58:00 +10:00
Eric
d260e6350c
fix exit status 2025-06-05 15:57:59 +10:00
Eric
0dcf8ded69
indicate with exit code 1 if the tests failed 2025-06-05 15:57:59 +10:00
Eric
7d3013f3b3
fix: pass show continuous updates into test manager instance 2025-06-05 15:57:59 +10:00
Eric
e902df5365
undo changes done for CI debugging 2025-06-05 15:57:58 +10:00
Eric
d3245c3aa8
Back off port inc in the hopes that this is causing issues with CI 2025-06-05 15:57:57 +10:00
Eric
6b8f6d539a
formatting
trying to make nph happy
2025-06-05 15:57:57 +10:00
Eric
8b70cbc13a
formatting 2025-06-05 15:57:57 +10:00
Eric
2cfd9635e7
clean up 2025-06-05 15:57:56 +10:00
Eric
e4ebfaafac
use tracked futures for showContinuousStatusUpdates 2025-06-05 15:57:56 +10:00
Eric
1218c493be
formatting 2025-06-05 15:57:56 +10:00
Eric
e98b60196a
format info blurbs 2025-06-05 15:57:56 +10:00
Eric
05a11cbe44
allow test parameters to be set from make testIntegration command 2025-06-05 15:57:55 +10:00
Eric
5338c567ed
DIsable continuous updates by default (for CI) 2025-06-05 15:57:55 +10:00
Eric
81ace10454
fix rebase, formatting 2025-06-05 15:57:55 +10:00
Eric
9a81fb9949
fix rebase 2025-06-05 15:57:55 +10:00
Eric
87727fbcd6
Use absolute path for binary when checking for existence 2025-06-05 15:57:55 +10:00
Eric
4661f467e6
fail early with message when hardhat binary not found
# Conflicts:
#	tests/integration/hardhatprocess.nim
2025-06-05 15:57:55 +10:00
Eric
756af9b2ab
remove unneeded sleep 2025-06-05 15:57:54 +10:00
Eric
8ca9d9f78d
make onoutputline callback gcsafe 2025-06-05 15:57:54 +10:00
Eric
982af54648
increase port distance per test run 2025-06-05 15:57:54 +10:00
Eric
35964f6e73
add constructor param for continuous status update in terminal
# Conflicts:
#	tests/testIntegration.nim
2025-06-05 15:57:54 +10:00
Eric
52efcbea57
fix nodeprocess not exiting 2025-06-05 15:57:54 +10:00
Eric
ff1eb8b05e
ensure timeouts work
Work around the AsyncProcess timeout not working correctly
2025-06-05 15:57:54 +10:00
Eric
78260feda3
continually show test status updates
allows user to know which tests are still running
2025-06-05 15:57:54 +10:00
Eric
855ba637e3
cleanup
# Conflicts:
#	tests/testIntegration.nim
2025-06-05 15:57:53 +10:00
Eric
c8d69b646c
lock hardhat start to avoid intermittent start failures 2025-06-05 15:57:53 +10:00
Eric
44faac5a97
clean up 2025-06-05 15:57:53 +10:00
Eric
5db892adf3
print hardhat testmanager errors and hardhat stdout when there is an error starting hardhat 2025-06-05 15:57:53 +10:00
Eric
0d186c69a1
hang manager off IntegrationTest, cleanup
- add a TestManager property to IntegrationTest, so manager does not need to be passed into all functions
- cleanup:
  - remove unneeded stopHardhat function
  - add hardhat instance to manager outside of startHardhat
2025-06-05 15:57:53 +10:00
Eric
79812001f1
pass hardhat port to ethersuite
# Conflicts:
#	tests/ethertest.nim
2025-06-05 15:57:53 +10:00
Eric
878a384794
reinstate removed types 2025-06-05 15:57:52 +10:00
Eric
f957c58c58
Add additional logging info print outs
# Conflicts:
#	tests/integration/testcli.nim
2025-06-05 15:57:52 +10:00
Eric
3af3162c04
expect process exit code
prevents showing error in the logs when an expected process exit code is encountered

# Conflicts:
#	tests/integration/testcli.nim
2025-06-05 15:57:52 +10:00
Eric
f9e26bde31
stop hardhat and show logs
# Conflicts:
#	tests/integration/hardhatprocess.nim
2025-06-05 15:57:52 +10:00
Eric
b841f04602
default test name to the filename of the integration test
# Conflicts:
#	tests/testIntegration.nim
2025-06-05 15:57:52 +10:00
Eric
8cce661d76
print start/finish stderr/stdout markers
# Conflicts:
#	tests/testIntegration.nim
2025-06-05 15:57:52 +10:00
Eric
bbea4371da
clean up 2025-06-05 15:57:51 +10:00
Eric
0e9439b201
stdout formatting for test results
# Conflicts:
#	tests/testIntegration.nim
2025-06-05 15:57:51 +10:00
Eric
28eb91b3a5
prevent errors during node shutdown 2025-06-05 15:57:51 +10:00
Eric
38f752667d
test summary formatting 2025-06-05 15:57:51 +10:00
Eric
092de71d9c
parallel tests running
- need to test with longer tests to ensure the parallelisation is truly happening
- is the +10 hardhat port needed?
- try with more integration tests

# Conflicts:
#	tests/integration/hardhatprocess.nim
#	tests/integration/multinodes.nim
#	tests/integration/testcli.nim
#	tests/testIntegration.nim
2025-06-05 15:57:51 +10:00
Eric
1bea94c390
fix(tests): fetching past contract events test (#1255) 2025-06-04 20:36:09 -07:00
markspanbroek
2dd436bfb7
fix(sales): do not crash when retrieving request fails (#1248) 2025-06-04 11:22:14 +00:00
Arnaud
45ade0e3c1
chore(marketplace): use canMarkProofAsMissing (#1188)
* Add canProofBeMarkedAsMissing

* Add more tests

* Update contracts submodule
2025-06-03 09:08:57 +00:00
Arnaud
ca869f6dce
fix(availabilities): use totalRemainingCollateral instead of totalCollateral for comparaison (#1229)
* Use totalRemainingCollateral instead of totalCollateral to compare the availability changes

* Update test to use totalRemainingCollateral instead of totalCollateral when testing OnAvailabilitySaved

* Reduce poll interval

* Fix flaky test

* Fix format
2025-06-02 16:47:12 +00:00
Giuliano Mega
d59c5b023c
chore: bump Nim to 2.2.4 (#1242)
* chore: bump Nim to 2.2.4

* fix: resolve symbol ambiguity and drop auto type

* fix: use reference to task instead of pointer or the compiler will deallocate `task` before the encoding/decoding is done

* fix: convention that maxCollateralPerByte equals totalRemainingCollateral when freeSize is 0 to avoid DivByZeroDefect

* fix: bump compiler version in CI pipeline as well
2025-05-29 16:37:38 -07:00
Arnaud
28a83db69e
chore: returns the collateral when a slot is reserved but not filled (#1216)
* Change token allowance method because increaseAllowance does not exist anymore

* Returns collateral when a reservation is deleted and not only a slot is filled

* Remove the returnedCollateral when the slot is not filled by the host

* Add returnedCollateral when the sale is ignored

* Add returnsCollateral variable for ignored state

* Rebase the contracts submodule on the master

* Add integration test

* Fix duration

* Remove unnecessary teardown function

* Remove misleading comment

* Get returned collateral from the request

* Enable logs to debug on CI

* Fix test

* Increase test timeout

* Fix typo

* Fix rebase
2025-05-29 14:47:37 +00:00