@ -20,21 +20,47 @@
## 🚩 Key Achievement(s)
From the list of planned items
| Milestone Headline | Strategic Objective | Realised Value (0/10)|
|----------------------------|----------------------------------------------|----------------------|
| Waku Store Database Metric | Objective link, We Need One, ND(Not defined) | |
| Milestone Headline | Strategic Objective | Realised Value (0/10) |
|-----------------------------------------------------|-------------------------------------------------------------------------------------------------------------------------------------|-----------------------|
| Direct Message Reliability | Improve p2p reliability of edge nodes | 8/10 |
| End-to-end reliability protocol | Provide agnostic protocol for reliability in group chats | 5/10 |
| Foundation for Communities Optimization | Simplify use of Waku to enable cheap optimization if needed | 8/10 |
| Scale up number of Communities | Introduce rendezvous as additional peer discovery mechanism | 1/10 |
| Nwaku in Status Desktop (Relay mode) | Demonstrate usage of nwaku/nim-library in Status Desktop/Golang Application | 10/10 |
| RLN Mainnet | Introduce economics to DoS protection smart contract and improve UX | 7/10 |
| Hardening and scaling foundations for private chats | Understand chat protocol to define roadmap, increase QA coverage for chat protocols | 7/10 |
| Upgrade Waku for the Web | Delivered end-to-end protocol to Web applications | 5/10 |
| Logos Web apps | Decentralized Forum PoC, Qaku library, demonstration of Codex integration w/ Waku and more resilience to Web3 RPC outages for nwaku | 7/10 |
| Explore Peer Discovery Gap | Partial Mixnet PoC, dogfooding store sync for network message consistency | 6/10 |
| Debugging Tools | Local metrics dashboard to enable study of software behaviour and usage of Waku | 5/10 |
## 🧩 Strategic Benefits Realised
- **[e.g. Protocol Responsiveness]**: [Broadens utility of Waku protocol]
- **[e.g. Rate Limited Nullifier PoC]**: [helps anti-spam and network load]
- **[Differentiator 3]**: [Explanation]
- Network DoS Protection: Improved UX and defined economic parameters
- P2P reliability: Improve recovery on network disconnection
- E2E reliability: Introduced scalable protocol for large group chat, that can extended to 1:1 chats. Both for native and browser applications.
- Nwaku in Golan application: Open the path to multi-language SDKs to fulfill needs of any application developers, including Logos Core.
- Various Waku Apps: teach them how to hunt by demonstrating potential Waku use-cases in different platforms and context.
- Mixnet PoC: Pave the path to increase anonymity property of Waku to a TOR-like (or above) level.
## 🚩 Non-Realised Item(s)
From the list of planned items
| Headline | Reason for not being realised | Carry(Yes/No) |
|----------------------------|-------------------------------|-----------------|
| SDS phase 1 rollout | e.g. descoped by sponsor | |
| Headline | Reason for not being realised | Carry(Yes/No) |
|---------------------------------------------------|---------------------------------------------------------------------------------------------------------------------------------|------------------|
| Local rate limit in Status Chat | No clear pathway to Status integration, new Chat SDK makes it irrelevant | No |
| Formal specs for Status chat protocols | New Chat SDK means new protocols, making proper documentation of existing protocols unnecessary | No |
| E2e reliability integration in Status Communities | Underestimation of effort to onboard developer to Nim, challenges to build FFI API (now solved), staffing issues | Yes |
| RLN audited and deployed on mainnet | Gross underestimation of the work needed, should have instead focus on needs to proceed with next dogfooding iteration | Yes with caveats |
| Incentivise running a Waku infrastructure | Onboarding to Nim, staffing issue which led to re-prioritizing RLN work instead of this | Yes |
| Global network metrics | Under-estimation + time to bootstrap collaboration with BI | Yes |
| Improved browser boostrap | TWN old RLN contract (no deposit) being spammed, blocking progress on this item | Yes |
| Browser simulations | Does not fit Vac-DST initial framework, increasing effort | Unclear |
| Formalize Codex integration with Waku | Unclear of benefit to progress beyond the current working integration in Qaku, refining needed, new FURPS to be proposed for H2 | Unclear |
| Mixnet PoC and MVP Roadmap | Dependency on Vac to complete libp2p-mixnet library | Yes |
| Nwaku in Status Mobile and Light Mode MVP | Underestimated work for desktop integration, reprioritized for H2 behind Chat SDK work | Yes |
| Debugging tools, log parser | Handed over to Vac-DST who already have similar log tool and just need to extend its functionality | No |
| Messaging API | Work was expected to only start in H1, which it did. Milestone was re-worked for H2 to better fit team resources | Yes |
## 🛠️ FURPS Execution Snapshot