* Add get active slot /slots/{slotId} to REST api, use utils/json
- Add endpoint /slots/{slotId} to get an active SalesAgent from the Sales module. Used in integration tests to test when a sale has reached a certain state. Those integration test changes will be included in a larger PR, coming later.
- Add OpenAPI changes for new endpoint and associated components
- Use utils/json instead of nim-json-serialization. Required exemption of imports from several packages that export nim-json-serialization by default.
* Only except `toJson` from import/export of chronicles
Previously it could take up to one second to complete
the future. This messed with the timings in the
integration tests and made them less predictable.
* [build] disable XCannotRaiseY hint
There are too many {.raises:[Defect].} in the
libraries that we use, drowning out all other
warnings and hints
* [build] disable BareExcept warning
Not yet enabled in a released version of Nim,
so libraries that we depend on have not fixed
this yet, drowning out our own hints and warnings
* [build] disable DotLikeOps warning
dot-like ops were an experiment that is not going
land in Nim
* [build] compile log statements in tests
When running tests, all log statements are compiled.
They are filtered out at runtime during a test run.
* [build] do not build executable when running unit test
It's already built in the integration test
* [build] Fix warnings
- remove unused code
- remove unused imports
- stop using deprecated stuff
* [build] Put compiler flags behind nim version checks
* [CI] remove Nim 1.2 compatibility