- remove RequestState as no longer being used
- remove RequestState check on purchase timeout
- add tests for `withdrawFunds` and `subscribeRequestCancelled`
- update `dagger-contracts` so that `RequestCancelled.requestId` property is indexed in the event
- rename `ContractId` to `SlotId`
- rename `Proving.contracts` to `Proving.slots`
- change signatures of `isSlotCancelled` and `isCancelled` to use `SlotId` and `RequestId` types, respectively.
- change all references to `RequestId`, `SlotId`
Add or remove proof requirements when a request contract’s state changes. When a request sale has completed (for a slot), the host who purchased that slot now must provide regular proofs for the data they are contracted to hold. This is now enforced by adding the slotId to the HashSet of Ids for which to require proofs. When a request has been cancelled (not all slots were filled before the request expired), proofs no longer need to be provided and the slotId is removed from teh HashSet.
Add `isCancelled` and `isSlotCancelled` checks to query the contract state without relying the on the state context variable in the contract. Because contract state can only be updated in a transaction, and the client withdrawing funds is responsible for changing the contract state to “Cancelled”, the `isCancelled` and `isSlotCancelled` functions were introduced to check the state regardless of whether or not the client had already withdrawn their funds.
- rename `ContractId` to `SlotId`
- add `RequestId`, `PurchaseId`, `Nonce` types as aliases of `array[32, byte]`
- rename `Proving.contracts` to `Proving.slots`
- change signatures of `isSlotCancelled` and `isCancelled` to use `SlotId` and `RequestId` types, respectively.
- change all references to `RequestId`, `SlotId`, and `PurchaseId`
* [contracts] ContractInteractions.new() now requires account parameter
* [cli] Only perform Ethereum interactions when --eth-account is specified
* [cli] Add --persistence option that is disabled by default
* [cli] Use Option for ethDeployment parameter
* [node] Better error reporting when Ethereum node cannot be reached
* Add Proving object, which maintains contract id's to watch
* [proving] invoke callback when proof is required
# Conflicts:
# dagger/por/timing/periods.nim
# dagger/por/timing/prooftiming.nim
* [proving] check proof requirements for all our contracts
# Conflicts:
# tests/dagger/helpers/mockprooftiming.nim
* Update vendor/dagger-contracts
* [proving] call onProofRequired() when proof is required soon
* [proving] stop checking contracts that have ended
* [proving] Remove duplicated funcs
* [proving] Implement ProofTiming on top of smart contract
* [proving] Fix race condition in waitUntilNextPeriod()
Sometimes waitUntilNextPeriod would take a while to
determine the current period, leading to unexpected results.
Splits waitUntilNextPeriod() into getCurrentPeriod()
and waitUntilPeriod(), to ensure that we're really waiting
for the period that we think we're waiting for.
Integrate dagger contracts from `nim-dagger-contracts` repo.
Add `dagger-contracts`, `nim-web3`, and all of `nim-web3`’s transitive deps as submodule deps to `nim-dagger`. Note: `nim-web3` and its transitive deps may no longer be needed when we switch to `nim-ethers`.
Add a `testContracts` nimble task to test all of the contracts functionality. Namely, this spins up an ethereum simulator, deploys the contracts (in `dagger-contracts`), runs the contract tests, and finally, regardless of success/error, kills the ethereum sim processes. The nimble task can be run with `./env.sh nimble testContracts`.
We also tested `nim-dagger-contracts` as a submodule dep of `nim-dagger`, and while the tests run as expected, the preference is to merge `nim-dagger-contracts` inside of `nim-dagger` for ease of parallel development. There’s also a high probability that `nim-dagger-contracts` is not being used as a dep by other projects. Are there any strong objections to this?
Co-authored-by: Michael Bradley <michaelsbradleyjr@gmail.com>