Commit Graph

6 Commits

Author SHA1 Message Date
Eric 20a63ce7d7
chore: update dependencies, especially nim-ethers to chronos v4 compatible version (#968)
* chore: bump dependencies, including nim-ethers with chronos v4 support

Bumps the following dependencies:
- nim-ethers to commit 507ac6a4cc71cec9be7693fa393db4a49b52baf9 which contains a pinned nim-eth version. This is to be replaced by a versioned library, so it will be pinned to a particular version. There is a crucial fix in this version of ethers that fixes nonce management which is causing issues in the Codex testnet.
- nim-json-rpc to v0.4.4
- nim-json-serialization to v0.2.8
- nim-serde to v1.2.2
- nim-serialization to v0.2.4

Currently, one of the integration tests is failing.

* fix integration test

- When a state's run was cancelled, it was being caught as an error due to catching all CatchableErrors. This caused a state transition to SaleErrored, however cancellation of run was not actually an error. Handling this correctly fixed the issue.
- Stopping of the clock was moved to after `HostInteractions` (sales) which avoided an assertion around getting time when the clock was not started.

* bump ethers to include nonce fix and filter not found fix

* bump ethers: fixes missing symbol not exported in ethers

* Fix cirdl test imports/exports

* Debugging in ci

* Handle CancelledErrors for state.run in one place only

* Rename `config` to `configuration`

There was a symbol clash preventing compilation and it was easiest to rename `config` to `configuration` in the contracts. Not even remotely ideal, but it was the only way.

* bump ethers to latest

Prevents an issue were `JsonNode.items` symbol could not be found

* More changes to support `config` > `configuration`

* cleanup

* testing to see if this fixes failure in ci

* bumps contracts

- ensures slot is free before allowing reservation
- renames config to configuration to avoid symbol clash
2024-11-04 07:31:43 +02:00
Adam Uhlíř 1a0d2d424e
feat: expiry specified with number of seconds (#793) 2024-05-06 17:35:46 +02:00
Adam Uhlíř de1714ed06
feat(api): availabilities patch endpoint (#692)
* feat(api): availabilities patch and reservations endpoints

* test: fixing tests and writing

* test: test reservations endpoint

* chore: feedback implementation

* chore: feedback implementation

* test: fix integration tests
2024-03-21 10:53:45 +00:00
markspanbroek 4d069599c9
Use real verifier (#737)
* use a real verifying contract address

* contracts: cleanup

* marketplacesuite: set correct circuit files, interval mining

* Proofs tests updates

Contains changes to get the proving tests working reliably.

* integration: use correct circom artifacts for creating proofs

* integration: cleanup

---------

Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>
2024-03-12 14:20:42 +00:00
markspanbroek 8589e63d34
Update contract (#734)
* Update codex-contracts-eth

* contracts: update G2Point definition

* integration: disable automatic advancing of time

reason: makes reasoning about timing in tests harder,
because the period is set to 60 seconds in the
marketplace configuration, but this code switches to
a new period every 500 milliseconds

* integration: fix parameters of marketplace payouts test

* integration: update test settings

* integration: fix typo

* integration: workaround for hardhat issue

Subscriptions expire after 5 minutes when using
websockets. Use http and polling instead.

* integration: remove origDatasetSizeInBlocks

* integration: fix proof parameters for test

* integration: do not log output by default

* integration: fix failure rate in test

* integration: fix warning

* integration: include clock in logs

* integration: allow for more periods

5 periods was cutting it close, if we get too much
pointer downtime, then the test would fail
2024-03-12 08:18:25 +00:00
Eric d70ab59004
refactor: multinode integration test refactor (#662)
* refactor multi node test suite

Refactor the multinode test suite into the marketplace test suite.

- Arbitrary number of nodes can be started with each test: clients, providers, validators
- Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file.
- Log files for all nodes can be persisted on disk, with configuration at the test-level
- Log files, if persisted (as specified in the test), will be persisted to a CI artifact
- Node config is specified at the test-level instead of the suite-level
- Node/Hardhat process starting/stopping is now async, and runs much faster
- Per-node config includes:
  - simulating proof failures
  - logging to file
  - log level
  - log topics
  - storage quota
  - debug (print logs to stdout)
- Tests find next available ports when starting nodes, as closing ports on Windows can lag
- Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests).
  - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively.
  - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively.

* additional logging for debug purposes

* address PR feedback

- fix spelling
- revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR.
- remove method label from raiseAssert
- remove unused import

* Use API instead of command exec to test for free port

Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs.

* clean up

* remove upraises annotations from tests

* Update tests to work with updated erasure coding slot sizes

* update dataset size, nodes, tolerance to match valid ec params

Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage.

Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params).

All integration tests pass when the async `clock.now` changes are reverted.

* dont use async clock for now

* fix workflow

* move integration logs uplod to reusable

---------

Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00