nim-codex/tests/integration/codexprocess.nim

88 lines
2.5 KiB
Nim
Raw Normal View History

refactor: multinode integration test refactor (#662) * refactor multi node test suite Refactor the multinode test suite into the marketplace test suite. - Arbitrary number of nodes can be started with each test: clients, providers, validators - Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file. - Log files for all nodes can be persisted on disk, with configuration at the test-level - Log files, if persisted (as specified in the test), will be persisted to a CI artifact - Node config is specified at the test-level instead of the suite-level - Node/Hardhat process starting/stopping is now async, and runs much faster - Per-node config includes: - simulating proof failures - logging to file - log level - log topics - storage quota - debug (print logs to stdout) - Tests find next available ports when starting nodes, as closing ports on Windows can lag - Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests). - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively. - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively. * additional logging for debug purposes * address PR feedback - fix spelling - revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR. - remove method label from raiseAssert - remove unused import * Use API instead of command exec to test for free port Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs. * clean up * remove upraises annotations from tests * Update tests to work with updated erasure coding slot sizes * update dataset size, nodes, tolerance to match valid ec params Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage. Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params). All integration tests pass when the async `clock.now` changes are reverted. * dont use async clock for now * fix workflow * move integration logs uplod to reusable --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00
import pkg/questionable
import pkg/questionable/results
import pkg/confutils
import pkg/chronicles
import pkg/chronos/asyncproc
refactor: multinode integration test refactor (#662) * refactor multi node test suite Refactor the multinode test suite into the marketplace test suite. - Arbitrary number of nodes can be started with each test: clients, providers, validators - Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file. - Log files for all nodes can be persisted on disk, with configuration at the test-level - Log files, if persisted (as specified in the test), will be persisted to a CI artifact - Node config is specified at the test-level instead of the suite-level - Node/Hardhat process starting/stopping is now async, and runs much faster - Per-node config includes: - simulating proof failures - logging to file - log level - log topics - storage quota - debug (print logs to stdout) - Tests find next available ports when starting nodes, as closing ports on Windows can lag - Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests). - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively. - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively. * additional logging for debug purposes * address PR feedback - fix spelling - revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR. - remove method label from raiseAssert - remove unused import * Use API instead of command exec to test for free port Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs. * clean up * remove upraises annotations from tests * Update tests to work with updated erasure coding slot sizes * update dataset size, nodes, tolerance to match valid ec params Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage. Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params). All integration tests pass when the async `clock.now` changes are reverted. * dont use async clock for now * fix workflow * move integration logs uplod to reusable --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00
import pkg/ethers
import pkg/libp2p
import pkg/stew/io2
refactor: multinode integration test refactor (#662) * refactor multi node test suite Refactor the multinode test suite into the marketplace test suite. - Arbitrary number of nodes can be started with each test: clients, providers, validators - Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file. - Log files for all nodes can be persisted on disk, with configuration at the test-level - Log files, if persisted (as specified in the test), will be persisted to a CI artifact - Node config is specified at the test-level instead of the suite-level - Node/Hardhat process starting/stopping is now async, and runs much faster - Per-node config includes: - simulating proof failures - logging to file - log level - log topics - storage quota - debug (print logs to stdout) - Tests find next available ports when starting nodes, as closing ports on Windows can lag - Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests). - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively. - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively. * additional logging for debug purposes * address PR feedback - fix spelling - revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR. - remove method label from raiseAssert - remove unused import * Use API instead of command exec to test for free port Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs. * clean up * remove upraises annotations from tests * Update tests to work with updated erasure coding slot sizes * update dataset size, nodes, tolerance to match valid ec params Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage. Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params). All integration tests pass when the async `clock.now` changes are reverted. * dont use async clock for now * fix workflow * move integration logs uplod to reusable --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00
import std/os
import std/strutils
import codex/conf
import ./codexclient
import ./nodeprocess
export codexclient
export chronicles
export nodeprocess
logScope:
topics = "integration testing codex process"
type
CodexProcess* = ref object of NodeProcess
client: ?CodexClient
method workingDir(node: CodexProcess): string =
return currentSourcePath() / ".." / ".." / ".."
method executable(node: CodexProcess): string =
return "build" / "codex"
method startedOutput(node: CodexProcess): string =
return "REST service started"
method processOptions(node: CodexProcess): set[AsyncProcessOption] =
return {AsyncProcessOption.StdErrToStdOut}
method outputLineEndings(node: CodexProcess): string =
return "\n"
method onOutputLineCaptured(node: CodexProcess, line: string) =
discard
method logFileContains*(node: CodexProcess, text: string): bool =
let config = CodexConf.load(cmdLine = node.arguments, quitOnFailure = false)
without logFile =? config.logFile.?string:
raiseAssert "codex node does have a --log-file option set (use .withLogFile())"
2024-10-29 09:56:01 +00:00
without logContents =? logFile.readAllChars, error:
raiseAssert "failed to open codex log file, aborting, error: " & error.msg
return logContents.contains(text)
refactor: multinode integration test refactor (#662) * refactor multi node test suite Refactor the multinode test suite into the marketplace test suite. - Arbitrary number of nodes can be started with each test: clients, providers, validators - Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file. - Log files for all nodes can be persisted on disk, with configuration at the test-level - Log files, if persisted (as specified in the test), will be persisted to a CI artifact - Node config is specified at the test-level instead of the suite-level - Node/Hardhat process starting/stopping is now async, and runs much faster - Per-node config includes: - simulating proof failures - logging to file - log level - log topics - storage quota - debug (print logs to stdout) - Tests find next available ports when starting nodes, as closing ports on Windows can lag - Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests). - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively. - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively. * additional logging for debug purposes * address PR feedback - fix spelling - revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR. - remove method label from raiseAssert - remove unused import * Use API instead of command exec to test for free port Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs. * clean up * remove upraises annotations from tests * Update tests to work with updated erasure coding slot sizes * update dataset size, nodes, tolerance to match valid ec params Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage. Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params). All integration tests pass when the async `clock.now` changes are reverted. * dont use async clock for now * fix workflow * move integration logs uplod to reusable --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00
proc dataDir(node: CodexProcess): string =
Prover CLI updates (#735) * rework cli to accept circuit params * check circom files extension * adding new required cli changes * don't use ufcs * persistence is a command now * use `nimOldCaseObjects` switch for nim confutils compat * misc * Update cli integration tests * Fix: simulateProofFailures option is not for validator * moving circom params under `prover` command * update tests * Use circuit assets from codex-contract-eth in tests * Add "prover" cli command to tests * use correct stores * make `verifier` a cmd option * update circuit artifacts path * fix cli tests * Update integration tests to use cli commands Integration tests have been updated to use the new cli commands. The api for usage in the integration tests has also changed a bit. Proofs tests have been updated to use 5 nodes and 8 blocks of data. The remaining integration tests also need to be updated. * remove parsedCli from CodexConfig Instead, parse the cli args on the fly when needed * remove unneeded gcsafes * graceful shutdowns Where possible, do not raise assert, as other nodes in the test may already be running. Instead, raise exceptions, catch them in multinodes.nim, and attempt to do a teardown before failing the test. `abortOnError` is set to true so that `fail()` will quit immediately, after teardown has been run. * update testmarketplace to new api, with valid EC params --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com> Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>
2024-03-12 09:57:13 +00:00
let config = CodexConf.load(cmdLine = node.arguments, quitOnFailure = false)
refactor: multinode integration test refactor (#662) * refactor multi node test suite Refactor the multinode test suite into the marketplace test suite. - Arbitrary number of nodes can be started with each test: clients, providers, validators - Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file. - Log files for all nodes can be persisted on disk, with configuration at the test-level - Log files, if persisted (as specified in the test), will be persisted to a CI artifact - Node config is specified at the test-level instead of the suite-level - Node/Hardhat process starting/stopping is now async, and runs much faster - Per-node config includes: - simulating proof failures - logging to file - log level - log topics - storage quota - debug (print logs to stdout) - Tests find next available ports when starting nodes, as closing ports on Windows can lag - Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests). - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively. - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively. * additional logging for debug purposes * address PR feedback - fix spelling - revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR. - remove method label from raiseAssert - remove unused import * Use API instead of command exec to test for free port Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs. * clean up * remove upraises annotations from tests * Update tests to work with updated erasure coding slot sizes * update dataset size, nodes, tolerance to match valid ec params Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage. Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params). All integration tests pass when the async `clock.now` changes are reverted. * dont use async clock for now * fix workflow * move integration logs uplod to reusable --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00
return config.dataDir.string
proc ethAccount*(node: CodexProcess): Address =
Prover CLI updates (#735) * rework cli to accept circuit params * check circom files extension * adding new required cli changes * don't use ufcs * persistence is a command now * use `nimOldCaseObjects` switch for nim confutils compat * misc * Update cli integration tests * Fix: simulateProofFailures option is not for validator * moving circom params under `prover` command * update tests * Use circuit assets from codex-contract-eth in tests * Add "prover" cli command to tests * use correct stores * make `verifier` a cmd option * update circuit artifacts path * fix cli tests * Update integration tests to use cli commands Integration tests have been updated to use the new cli commands. The api for usage in the integration tests has also changed a bit. Proofs tests have been updated to use 5 nodes and 8 blocks of data. The remaining integration tests also need to be updated. * remove parsedCli from CodexConfig Instead, parse the cli args on the fly when needed * remove unneeded gcsafes * graceful shutdowns Where possible, do not raise assert, as other nodes in the test may already be running. Instead, raise exceptions, catch them in multinodes.nim, and attempt to do a teardown before failing the test. `abortOnError` is set to true so that `fail()` will quit immediately, after teardown has been run. * update testmarketplace to new api, with valid EC params --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com> Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>
2024-03-12 09:57:13 +00:00
let config = CodexConf.load(cmdLine = node.arguments, quitOnFailure = false)
refactor: multinode integration test refactor (#662) * refactor multi node test suite Refactor the multinode test suite into the marketplace test suite. - Arbitrary number of nodes can be started with each test: clients, providers, validators - Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file. - Log files for all nodes can be persisted on disk, with configuration at the test-level - Log files, if persisted (as specified in the test), will be persisted to a CI artifact - Node config is specified at the test-level instead of the suite-level - Node/Hardhat process starting/stopping is now async, and runs much faster - Per-node config includes: - simulating proof failures - logging to file - log level - log topics - storage quota - debug (print logs to stdout) - Tests find next available ports when starting nodes, as closing ports on Windows can lag - Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests). - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively. - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively. * additional logging for debug purposes * address PR feedback - fix spelling - revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR. - remove method label from raiseAssert - remove unused import * Use API instead of command exec to test for free port Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs. * clean up * remove upraises annotations from tests * Update tests to work with updated erasure coding slot sizes * update dataset size, nodes, tolerance to match valid ec params Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage. Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params). All integration tests pass when the async `clock.now` changes are reverted. * dont use async clock for now * fix workflow * move integration logs uplod to reusable --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00
without ethAccount =? config.ethAccount:
raiseAssert "eth account not set"
return Address(ethAccount)
proc apiUrl*(node: CodexProcess): string =
Prover CLI updates (#735) * rework cli to accept circuit params * check circom files extension * adding new required cli changes * don't use ufcs * persistence is a command now * use `nimOldCaseObjects` switch for nim confutils compat * misc * Update cli integration tests * Fix: simulateProofFailures option is not for validator * moving circom params under `prover` command * update tests * Use circuit assets from codex-contract-eth in tests * Add "prover" cli command to tests * use correct stores * make `verifier` a cmd option * update circuit artifacts path * fix cli tests * Update integration tests to use cli commands Integration tests have been updated to use the new cli commands. The api for usage in the integration tests has also changed a bit. Proofs tests have been updated to use 5 nodes and 8 blocks of data. The remaining integration tests also need to be updated. * remove parsedCli from CodexConfig Instead, parse the cli args on the fly when needed * remove unneeded gcsafes * graceful shutdowns Where possible, do not raise assert, as other nodes in the test may already be running. Instead, raise exceptions, catch them in multinodes.nim, and attempt to do a teardown before failing the test. `abortOnError` is set to true so that `fail()` will quit immediately, after teardown has been run. * update testmarketplace to new api, with valid EC params --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com> Co-authored-by: Eric <5089238+emizzle@users.noreply.github.com>
2024-03-12 09:57:13 +00:00
let config = CodexConf.load(cmdLine = node.arguments, quitOnFailure = false)
refactor: multinode integration test refactor (#662) * refactor multi node test suite Refactor the multinode test suite into the marketplace test suite. - Arbitrary number of nodes can be started with each test: clients, providers, validators - Hardhat can also be started locally with each test, usually for the purpose of saving and inspecting its log file. - Log files for all nodes can be persisted on disk, with configuration at the test-level - Log files, if persisted (as specified in the test), will be persisted to a CI artifact - Node config is specified at the test-level instead of the suite-level - Node/Hardhat process starting/stopping is now async, and runs much faster - Per-node config includes: - simulating proof failures - logging to file - log level - log topics - storage quota - debug (print logs to stdout) - Tests find next available ports when starting nodes, as closing ports on Windows can lag - Hardhat is no longer required to be running prior to starting the integration tests (as long as Hardhat is configured to run in the tests). - If Hardhat is already running, a snapshot will be taken and reverted before and after each test, respectively. - If Hardhat is not already running and configured to run at the test-level, a Hardhat process will be spawned and torn down before and after each test, respectively. * additional logging for debug purposes * address PR feedback - fix spelling - revert change from catching ProviderError to SignerError -- this should be handled more consistently in the Market abstraction, and will be handled in another PR. - remove method label from raiseAssert - remove unused import * Use API instead of command exec to test for free port Use chronos `createStreamServer` API to test for free port by binding localhost address and port. Use `ServerFlags.ReuseAddr` to enable reuse of same IP/Port on multiple test runs. * clean up * remove upraises annotations from tests * Update tests to work with updated erasure coding slot sizes * update dataset size, nodes, tolerance to match valid ec params Integration tests now have valid dataset sizes (blocks), tolerances, and number of nodes, to work with valid ec params. These values are validated when requested storage. Print the rest api failure message (via doAssert) when a rest api call fails (eg the rest api may validate some ec params). All integration tests pass when the async `clock.now` changes are reverted. * dont use async clock for now * fix workflow * move integration logs uplod to reusable --------- Co-authored-by: Dmitriy Ryajov <dryajov@gmail.com>
2024-02-19 04:55:39 +00:00
return "http://" & config.apiBindAddress & ":" & $config.apiPort & "/api/codex/v1"
proc client*(node: CodexProcess): CodexClient =
if client =? node.client:
return client
let client = CodexClient.new(node.apiUrl)
node.client = some client
return client
method stop*(node: CodexProcess) {.async.} =
logScope:
nodeName = node.name
await procCall NodeProcess(node).stop()
trace "stopping codex client"
if client =? node.client:
client.close()
node.client = none CodexClient
method removeDataDir*(node: CodexProcess) =
os.removeDir(node.dataDir)